Laserfiche WebLink
2 . Backfill — Only good quality backfill , free of stones , roots , rocks , broken <br /> cement or other material that might be damaging to the pipe shall be used . <br /> Backfill must be put in the trench in lifts . <br /> 31 Compaction — All pipe must be compacted by hand tamping to the <br /> centerline , under the pipe . Backfill shall be compacted in lifts up to the <br /> surface to achieve a minimum compaction of 98 % of maximum density in <br /> roadways , shoulders , and easements in accordance with AASHTO <br /> Specifications T- 180 and ASTM 13-2167 . <br /> 4 . Dewatering — Construction shall be accomplished in a dry trench . Well <br /> pointing may be required , as necessary. All water entering excavations or <br /> other parts of the work shall be contained , collected and pumped to <br /> suitable places for disposal as permitted by the Local , State or Water <br /> Management District, <br /> 5 . Sheeting — Sheeting and shoring shall be installed as may be necessary <br /> for the protection of the work , preservation of adjacent property and <br /> structures and the safety of employees . Sheeting and bracing shall be <br /> uniform to OSHA requirements . <br /> E . Installation of water mains must be in accordance with latest AWWA Standard <br /> Specifications C- 600 Series , irrespective of the type of pipe selected . All <br /> installation procedures must also be in conformance with pipe manufacturer's <br /> recommendations . Minimum depth of cover shall be 36- inches . A 2-inch wide <br /> magnetic I . D . tape shall be placed continuously in the trench over all pipes , 12- <br /> inches below grade . Trace wire shall be wrapped on all pipes , per Detail MA4 , <br /> valves , fittings, and all appurtenances . Allowable deflection of the pipe joints and <br /> curvature of PVC pipe shall not exceed the manufacturer's specifications . <br /> 1 . Trench — Trench width shall be kept to a minimum necessary for pipe <br /> installation and shall comply with current OSHA requirements . The trench <br /> bottom shall be graded and alignment shall be parallel with roadway, <br /> where possible . <br /> 2 . Backfill — Only good quality backfill , free of stones , roots , rocks , broken <br /> cement or other material that might be damaging to the pipe shall be used . <br /> Backfill must be put in the trench in lifts . <br /> 3 . Compaction — All pipe must be compacted by hand tamping to the <br /> centerline , under the pipe . Backfill shall be compacted in lifts up to the <br /> surface to achieve a minimum compaction of 98 % of maximum density in <br /> roadways , shoulders , and easements in accordance with AASHTO <br /> Specifications TA 80 and ASTM D-2167 . <br /> 4 . Dewatering — Construction shall be accomplished in a dry trench . Well <br /> pointing may be required , as necessary. All water entering excavations or <br /> other parts of the work shall be contained , collected and pumped to <br /> suitable places for disposal as permitted by the Local , State or Water <br /> Management District. <br /> 11 - 6 <br />