My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Existing and predicted population of areas to be <br /> served . <br /> (3 ) The effect of the proposed gravity sewer collection <br /> system on existing and proposed gravity sewer <br /> collection systems or pumping stations and force <br /> mains . Pump stations shall be modeled , and all in-line <br /> pumping stations and force mains receiving these <br /> additional flows shall be considered . <br /> c. The effect of the proposed gravity sewer collection system on <br /> the wastewater treatment plant receiving the flows . <br /> ( 1 ) The estimated daily flow. <br /> (2) Description of materials to be used . <br /> (3 ) A preliminary cost estimate . <br /> (4 ) Any other factors which would affect design and use of <br /> the sewage system . <br /> d . Pumping station and force main system : <br /> ( 1 ) Description of geographical area to be served . <br /> (2 ) Existing and predicted population of area to be served . <br /> (3 ) Calculations for projected flows , . wet well sizing , pump <br /> sizing and selection , force main sizing , and buoyancy . <br /> (4 ) The effect of the proposed pumping station and force <br /> main system on existing or proposed pumping station <br /> and force main systems or gravity sewer systems <br /> receiving these additional flows . Pump stations shall <br /> be hydraulically modeled , along with all in-line pumping <br /> stations and force mains . <br /> (5 ) The effects of the proposed pumping station and force <br /> main systems on the wastewater treatment plant <br /> receiving these flows . <br /> (6 ) Description of materials to be used . <br /> (7) A preliminary cost estimate . <br /> (8 ) Any other factor which would affect design and use of <br /> the pumping station and force . main system . <br /> 4 . A review fee , as set forth in the current rate schedule . This fee shall <br /> cover review of a water system , a sewer system , or both , if submitted <br /> at the same time . <br /> 5 . One original signed and sealed Department of Environmental <br /> Protection permit application for IRCDUS records . <br /> 12 . 02 CONSTRUCTION PERMIT <br /> A. Prior to permit issuance and scheduling of a pre-construction meeting , three <br /> (3 ) sets of construction plans and specifications shall be submitted , signed <br /> and sealed by a Professional Engineer registered in the State of Florida , to <br /> be approved , stamped , and signed by IRCDUS . One ( 1 ) set shall be retained <br /> for IRCDUS records , one ( 1 ) set shall be delivered to the IRCDUS inspector, <br /> and one ( 1 ) set shall be returned to the Engineer of Record . <br /> 12-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.