Laserfiche WebLink
SECTION 13 <br /> WATER AND SEWER TREATMENT PLANTS <br /> 13 . 01 GENERAL <br /> This section sets forth the general requirements for design and installation of <br /> sewer and water treatment plants to be constructed within the County. <br /> 13 . 02 DESIGN STANDARDS <br /> Required Reference : Facilities shall comply with the design and installation <br /> requirements as established by the Florida Department of Environmental <br /> Protection and additional specific requirements stated in these standards . <br /> The criteria set forth in the "Ten State Standards-Recommended Standards <br /> for Water Works " , latest edition , should be used as a design guide for water <br /> treatment facilities . The criteria set forth in the "Ten State Standards- <br /> Recommended Standards for Wastewater Facilities" , latest edition , shall be <br /> used as a design guide for sewage treatment facilities . <br /> 13 . 03 STANDARD REQUIREMENTS <br /> A. Building and Structure Sites <br /> 1 . Clearing — Clear and remove obstructions within building sites only as <br /> required to provide adequate workspace and/or accomplish the <br /> specified construction . The removal of trees or permanent structures <br /> within the specified construction areas shall be done only as <br /> approved or directed by the County. Should the removal of valuable <br /> trees or shrubs be required , this work shall be done in cooperation <br /> with the local communities , in which the work takes place , in order <br /> that they may be replanted , if so desired . At sites of new structures , <br /> remove only such trees and shrubs as are necessary to facilitate the <br /> work and protect trees to remain against damage during construction <br /> period . <br /> 2 Grubbing — Grubbing shall be performed where required , including , <br /> but not limited to , areas where fill will be placed , structures erected , <br /> or where other installation is required . It shall include the complete <br /> removal of all obstructions resting on or protruding through the <br /> surface of the existing ground to a depth of three feet below finished <br /> grade . Where excavation is done , all stumps , roots and deleterious <br /> material thereby exposed shall be removed to a depth of three feet <br /> minimum below the excavated surface . <br /> 3 . Disposal of Cleared and Grubbed Material — All refuse from clearing <br /> and grubbing operations shall be disposed of either by burning or <br /> removal to a dump area approved by the County. Burning shall be <br /> done at locations , and at times as directed , in a manner that will avoid <br /> all hazards . Permit(s ) shall be obtained from all applicable authorities <br /> for burning and burning shall be kept under constant attendance until <br /> the fires have burned out or have been extinguished . Burning <br /> operations shall be done in compliance with all applicable regulations . <br /> 13- 1 <br />