Laserfiche WebLink
4 . Unsuitable Material — All muck or other unsuitable material within the <br /> limits of building sites , or other designated areas , shall be excavated <br /> and removed . Depth of removal shall be that required to reach an <br /> approved suitable material . Removal and subsequent backfilling <br /> shall be maintained within the limits of the designated construction <br /> area unless specifically approved otherwise by the County. Sheeting <br /> shall be installed and left in place along the site boundary , where <br /> required , in order to preclude infringement on adjacent property and <br /> prevent damage by future de-mucking . The Contractor shall dispose <br /> of muck or other unsuitable material . <br /> 5 . Fill — Suitable fill material shall be placed and compacted where muck <br /> or other unsuitable material has been removed and as required to <br /> elevate the site to finished grade . Fill material shall conform to U . S . <br /> Bureau of Public Roads , Classification A-3 , and as approved by a <br /> testing laboratory and the Public Works Division . Fill shall be placed <br /> in successive layers of not more than 12 inches , loose measure , and <br /> suitably I <br /> compacted to 95 % minimum of maximum density, as <br /> determined by AASHTO Specifications T- 180 , unless higher <br /> percentage is necessary in specific locations . Side slopes shall not <br /> exceed 2 . 5 (horizontal ) to 1 (vertical ) , unless specifically approved <br /> otherwise , and shall be protected from erosion by staggered solid <br /> grass sodding , or other approved method . An approved , Florida <br /> State Certified testing laboratory shall make density tests for <br /> determination of the specified compaction . <br /> 6 . Grading — All building sites shall be properly graded , including all <br /> cutting and filling necessary for the construction . Finish building site <br /> elevations shall be as required to preclude flooding and shall receive <br /> prior approval from the County. Filling shall be accomplished , if <br /> necessary , to provide acceptable site elevations . Finish surface <br /> grades shall eliminate potholes , abrupt changes in grade and bring <br /> the ground to an even surface , and shall provide adequate drainage <br /> for the complete site , with special consideration for the following . The <br /> grade shall be sloped evenly to provide drainage away from the <br /> building walls in all directions at Y4 inch per foot minimum for at least <br /> 10 feet from the building walls . Drainage swales shall have a <br /> minimum flow-line grade of not less than 1 /8 inch per foot. Rounding <br /> shall be provided at top and bottom of banks and at other breaks in <br /> grade . <br /> 7 . Asphaltic Concrete Pavement — Driveways , parking locations and <br /> other vehicular traffic areas at building sites shall be paved with an <br /> asphaltic concrete surface course . The dimensions for said surfacing <br /> shall be in accordance with good engineering practice and suitable <br /> for the designated service . Roadbed stabilization shall be 6-inch <br /> minimum below the base course and shall have a minimum Florida <br /> Bearing Value of 50 pounds per square inch . Base course shall be <br /> limerock or soil-cement, placed to 6-inch minimum thickness . Prime <br /> coat shall be rapid curing cutback asphalt RC-70 , applied at the rate <br /> of 0 . 10 gallon per square yard . Asphaltic Concrete Surface Course <br /> shall be 1 -inch minimum thickness , Type ll . <br /> 13-2 <br />