Laserfiche WebLink
INDIAN RIVER COUNTY <br /> DEPARTMENT OF UTILITY SERVICES <br /> UTILITY CONSTRUCTION PERMIT CHECKLIST <br /> Permit Issuance Date : <- - - 2002 <br /> Permit No . : <UCP # > <br /> Project Name . . < > <br /> Owner/Developer . < > <br /> Engineer-of-Record : < > <br /> Description : < - - > <br /> Rece Desch x <br /> ..,x �„ ,is° <br /> ,ry T s1 t ©n ��. ' ( r a <br /> - - - 1 . Three (3 ) sets of Record Drawings (hard copy and electronic format) , consisting <br /> of one set of reproducible mylars and two sets of blue/black line prints signed <br /> and sealed by the Engineer-of-Record. The. Engineer-of-Record must be <br /> registered to practice in the State of Florida. <br /> - - - 2 . Copy of a satisfactory hydrostatic pressure test, signed by the Engineer-of- <br /> Record. <br /> - - - 3 . One complete set of daily field inspection records prepared by the on-site <br /> inspector certified by the Engineer-of-Record, <br /> - - - 4 . Copy of a satisfactory bacteriological main clearance certified by the Engineer- <br /> of-Record. <br /> - - - 5 . Record by the design firm of the estimated amount of water used by the <br /> contractor during the construction and flushing of the water lines . <br /> - - - 6 . Certification by the Engineer-of-Record that the water line was sanitized in <br /> accordance with County specifications . <br /> - - - 7 . Certification by the Engineer-of-Record that the construction of the water <br /> distribution system is complete and in accordance with County construction and <br /> material specifications . Any deviation from the approved construction drawings <br /> or County specifications must be specifically identified and justified by the <br /> Engineer. <br /> - - - 8 . Copy of a clearance letter from the Florida Department of Environmental <br /> Protection (FDEP) authorizing the water distribution system to be placed into <br /> service . <br /> - - - 9 . Dedication of the water distribution system and accompanying easements . The <br /> dedication is to include an itemized list of all materials along with total <br /> materials, construction and engineering costs . <br /> - - - 10 . Where the water distribution system is located in established easements or road <br /> rights-of-way, the attached bill of sale is to be executed along with an itemized <br /> list of all materials to include materials and construction costs . <br /> - - - 11 . Complete on-site inspection by a County utility inspector with confirmation that <br /> the water distribution system appears acceptable , <br /> - - - 12 . $ 150 . 00 review fee payment. <br /> . . . 13 . Arrangements for payment of all impact fees and other costs of connections . <br /> - - - 14 . Release of lien(s) from each Contractor, Subcontractor and Vendor. <br /> . . . 15 . A one-year maintenance bond in an amount equaling 25 % of the total cost for <br /> construction of the system . <br /> UTILITY CONSTRUCTION <br /> PERMIT CHECKLIST <br /> FAUtilitim UTILITY - CONSTRI f(:TiON STANDARDSWim; mode\i Uility Cnnsmmeinn Permit - Chmklist-PUBLIC.dm <br />