Laserfiche WebLink
INDIAN RIVER COUNTY <br /> DEPARTMENT OF UTILITY SERVICES <br /> UTILITY CONSTRUCTION PERMIT CHECKLIST — <br /> WASTEWATER COLLECTION/TRANSMISSION SYSTEM <br /> Permit Issuance Date : G - - 2002 <br /> Permit No. . <UCP # > <br /> Project Name : < > <br /> Owner/Developer : < > <br /> Engineer-of-Record : < > <br /> Description : <br /> Rl,erTSG s <br /> .. DeSCI1 " 4 >» " �"?n + � '5 ` "R <br /> - - - 1 . Three (3 ) sets of Record Drawings (hard copy and electronic format), consisting <br /> of one set of reproducible mylars and two sets of blue/black line prints signed <br /> and sealed by the Engineer-of-Record. The Engineer-of-Record must be <br /> registered to practice in the State of Florida. <br /> - - - 2 . Copy of a satisfactory hydrostatic pressure test or infiltration/exfiltration test, <br /> signed by the Engineer-of-Record. <br /> - - - 3 . One complete set of daily field inspection records prepared by the on-site <br /> I <br /> n ector certified by the Engineer-of-Record. <br /> - - - 4 . Copy of a satisfactory television test and a certified report by the Engineer-of- <br /> Record. <br /> - - - 5 . Certification by the Engineer-of-Record that the construction of the wastewater <br /> collection/transmission system is complete and in accordance with County <br /> construction and material specifications . Any deviation from the approved <br /> construction drawings or County specifications must be specifically identified <br /> and justified by the Engineer. <br /> - - - 6 . Copy of a clearance letter from the Florida Department of Environmental <br /> Protection (FDEP) authorizing the wastewater collection/transmission system to <br /> be placed into service . <br /> - - - 7 . Dedication of the wastewater collection/transmission system and accompanying <br /> easements . The dedication is to include an itemized list of all materials along <br /> with total materials , construction and engineering costs . <br /> - - - 8 . Where the wastewater collection/transmission system is located in established <br /> easements or road rights-of-way, the attached bill of sale is to be executed along <br /> with an itemized list of all materials to include materials and construction costs . <br /> - - - 9 . Complete on- site inspection by a County utility inspector with confirmation that <br /> the wastewater collection/transmission system appears acceptable . <br /> - - - 10 . $ 150 . 00 review fee payment. <br /> - - - 11 . Arrangements for payment of all impact fees and other costs of connections . <br /> . . . 12 . Release of lien(s) from each Contractor, Subcontractor and Vendor. <br /> . . . 13 . A one -year maintenance bond in an amount equaling 25 % of the total cost for <br /> construction of the system. <br /> . . . 14 . A set of lift station specifications (if applicable) , two sets of operations and <br /> maintenance manuals , warranty, and all spare parts as required by County <br /> standards . <br /> - - - 15 . Transfer of lift station ' s electric account from Developer to County. <br /> UTILITY CONSTRUCTION <br /> PERMIT CHECKLIST <br /> FAUtilities\UTILITY - CONSTRUCTION STANDARDSVinal mods\Utility Construction Permit - Checklist-PUBLIC.doc <br />