My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
placed to fill any voids created and the backfill shall again be <br /> compacted to provide uniform side support for the pipe . <br /> W . Unless otherwise approved concrete thrust blocks shall be <br /> installed at all fittings and other locations as directed by the <br /> Engineer. Minimum bearing area shall be as shown on the <br /> Drawings . Concrete shall be placed against undisturbed material <br /> and shall not cover joints , bolts or nuts , or interfere with the <br /> removal of any joint. Wooden side forms shall be provided for <br /> thrust blocks . <br /> X . Restrained joints shall be installed where shown on the Drawings , <br /> required by IRCDUS Standards , or as directed by the Engineer. <br /> 3 . 14 MARKING FOR OPEN CUT METHOD <br /> A. Number 10 stranded conductor copper trace wire shall be spiral <br /> wrapped or affixed to the top of the pipe . See trace wire Detail M- <br /> 16 for specifications regarding installation . <br /> Be Trace wire is required over all pipes . <br /> C . A 2" wide magnetic I . D . location tape is required over all pipes . <br /> Tape is to be installed 12" below proposed finished grade . <br /> 3 . 15 TRENCHLESS INSTALLATION OF PRESSURE MAINS BY <br /> DIRECTIONAL BORING <br /> A . DESCRIPTION <br /> 1 . Portions of the pressure mains shall be installed by the <br /> directional bore method within the limits indicated of the <br /> contract plans and as specified here in . Generally, as a <br /> minimum , the pressure main is to be located within the road <br /> right-of-way and shall be installed by directional boring . <br /> 2 . This section includes material , performance and installation <br /> standards , and the contractor's responsibilities associated with <br /> the furnishing of labor, material , equipment, and identical <br /> required to install , complete , required trenchless installation of <br /> pressure mains , as shown on the Drawings and as specified <br /> herein . <br /> Be EXPERIENCE <br /> 1 , The Contractor must demonstrate expertise in trenchiess <br /> method by providing a list of ten ( 10 ) utility references for <br /> which similar work has been preformed in the last two years . <br /> The references should include a name and phone number <br /> where the contact can be made to verify the contractor's <br /> capability. The contractor must provide documentation <br /> 3 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.