My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
showing successful completion of the projects used for <br /> reference . Conventional trenching experience will not be <br /> considered applicable . <br /> 2 . Supervisory personnel must be adequately trained and shall <br /> have at least four (4) years experience in directional boring . <br /> The Contractor shall submit the names and resumes of all <br /> supervisory field personnel prior to construction . <br /> 3 . Because of time constraints , the Contractor may wish to <br /> provide multiple experience directional boring crews . <br /> 4 . Directional boring equipment shall be capable of installing the <br /> minimum pipe diameter noted on the drawings . <br /> B . SUBMITTALS <br /> 1 . Submit technical data for equipment including clay slung <br /> material , method of installation with working drawings , and <br /> proposed sequence of construction for approval by the <br /> Engineer. <br /> 2 . Prior approval for directional boring , the Contractor must <br /> submit the names of supervisory personnel , and history <br /> information of the directional boring experience . In addition the <br /> Contractor must submit for approval nameplate , data for the <br /> drilling equipment, mobile spoils removal units and Material <br /> Safety Data Sheets ( MSDS ) information for the drilling slurry <br /> compounds . <br /> 3 . The Contractor is required to bring to the attention of the <br /> engineer any known design discrepancies with actual <br /> tunneling methods that the contractor will be performing . This <br /> shall be stated in writing to the Engineer at the pre- <br /> construction meeting . <br /> C . INSTALLATION <br /> 1 . Installation shall be in a trenchless manner producing <br /> continuous bores . <br /> 2 . The tunneling system shall be remotely steerable and permit <br /> electronic monitoring of tunnel depth and location . Accurate <br /> placement of pipe within a +/- 2-inch window is required both <br /> horizontally and vertically. Turning capability of 90-degrees <br /> radius in 40 feet is required . Continuous monitoring of the <br /> boring head is required , including across open water if <br /> necessary . <br /> 3 . The directional boring Contractor shall submit certification , by <br /> a Professional Engineer licensed in the State of Florida , that <br /> the directional boring has been preformed in accordance to the <br /> construction drawings , and shall submit signed and sealed <br /> drawings . Record Drawings (As- Built) shall provide both . in <br /> both electronic format and hard paper copy . <br /> 3 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.