My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QMi ' WA <br /> NAME AND LOCATION : BILL BAGGS CAPE FLORIDA STATE PARK <br /> DAY USE PAVILLION & RESTROOM <br /> 1200 S Crandon Blvd . <br /> Key Biscayne, Florida 33149 <br /> FIRM RESPONSIBILITY: General Contractor <br /> PROJECT OWNER/REP. : Florida Department of Environmental Protection <br /> Division of Recreation and Parks <br /> Michael Renard, Contracts Manager <br /> 3540 Thomasville Road <br /> Tallahassee, FL 32309 <br /> PH : 850 . 488 . 5372 FX : 850 .245 .2128 <br /> PROJECT ARCHITECT: Florida DEP Bureau of Design and Recreation <br /> Marvin H . Allen <br /> 3900 Commonwealth Blvd . <br /> Tallahassee, Florida 32399 <br /> PH : 850 .488 . 5372 FX : 850 .245 .2128 <br /> PROJECT ENGINEER : McDonald Group International, Inc. <br /> George McDonald <br /> 9030 S . Brittany Path <br /> Inverness, Florida 34452 <br /> PH : 352 . 637 . 1652 FX : 352 . 637 .3679 <br /> COMPLETION DATE : January 3 , 2004 <br /> PROJECT SIZE : 19000 SF <br /> PROJECT COST: $3079000 . 00 <br /> KEY PROFESSIONALS : Mark MacDonald, Project Executive; Jennifer Sullivan, Project Manager; <br /> Laurie Herter, Finance Controller <br /> STAFF RESPONSIBILITIES : Ocean Gate General Contractors provided the necessary labor, supervision, equipment, <br /> and materials to construct wood boardwalks over the dunes, a restroom , and pavilion <br /> according to the plans provided . We made excavations for piping, water mains, sewer <br /> lines , and pertaining structures . In addition, Ocean Gate was responsible for backfill <br /> excavations and the disposal of excess or unsuitable materials from excavation . We <br /> provided and placed necessary borrow material in order to properly backfill <br /> excavations . Ocean Gate installed timber piles to support the structure, reinforced <br /> steel with concrete, completed carpentry finishing work to the structure, and installed <br /> shingle roofing . We cast in place concrete wing walls, concrete sidewalks, and wooden <br /> boardwalks over the dunes . <br />
The URL can be used to link to this page
Your browser does not support the video tag.