My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> T <br /> z <br /> 3 , <br /> # yji T • <br /> NAME & LOCATION : LAKE LOUISA STATE PARK <br /> Orlando, FL <br /> FIRM RESPONSIBILITY: General Contractor <br /> PROJECT OWNER/REP. : Florida Department of Environmental Protection <br /> Ken Tilbury <br /> 3900 Commonwealth Blvd. <br /> Tallahassee, FL 32399-3000 <br /> PH : 850.488 . 5372 FX : 850 .245 .2128 <br /> PROJECT ARCHITECT: Florida DEP Bureau of Design and Recreation <br /> Steve Watson <br /> 3900 Commonwealth Blvd. <br /> Tallahassee, FL 32399 <br /> PH : 850 .488 . 5372 FX : 850 .245 .2128 <br /> PROJECT ENGINEER : Registe Engineering Group, Inc. <br /> 41 Jacques Registe <br /> 1427 N . Bronough St. <br /> Tallahassee, FL 32303 <br /> PH : 850 . 894 .4521 FX : 850 .224 .0505 <br /> ESTIMATED/COMPLETION DATE : August 2005 <br /> PROJECT SIZE : 40,000 SF <br /> PROJECT COST: $2 . 9 M <br /> KEY PROFESSIONALS : Mark MacDonald, Project Executive; Jack MacDonald, Project Manager; Greg <br /> Johnston, Superintendent <br /> DESCRIPTION OF PROJECT: Ocean Gate General Contractors was hired by the Florida DEP to construct <br /> 20 waterfront cabins that utilizes solar energy. Each cabin was outfitted with <br /> airconditioning, a kitchen, two (2 ) bedrooms, two (2 ) bathrooms and a fire <br /> place . We paid particular attention to the contract regulations and require- <br /> ments for the project that resulted in quality end products . The spectacular <br /> views and the beautiful surrounding area were a sensitive issue when <br /> working . As an environmentally friendly company, Ocean Gate ensured that <br /> t the crew followed all of the guidelines in order to preserve the surrounding <br /> area. This project was completed on time . <br />
The URL can be used to link to this page
Your browser does not support the video tag.