My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YY 3 <br /> df y( a <br /> • Y� <br /> M <br /> NAME AND LOCATION : CAYO COSTA STATE PARK <br /> Boca Grande, Florida <br /> FIRM RESPONSIBILITY: General Contractor <br /> PROJECT OWNER : Florida Department of Environmental Protection <br /> Michael Renard <br /> 3900 Commonwealth Blvd . <br /> Tallahassee, Florida 32399 <br /> PH : 850 .488 . 5372 FX : 850 .245 .2128 <br /> PROJECT ARCHITECT: Florida DEP Bureau of Design and Recreation <br /> Thomas Smith <br /> 3900 Commonwealth Blvd . <br /> Tallahassee, Florida 32399 <br /> PH : 850 . 488 . 3539 FX : 850.245 .2128 <br /> PROJECT ENGINEER : Florida DEP Bureau of Design and Recreation <br /> Marvin Allen <br /> 3900 Commonwealth Blvd . <br /> Tallahassee, Florida 32399 <br /> PH : 850 . 488 . 3599 FX : 850 .245 .2128 <br /> COMPLETION DATE : April 30, 2004 <br /> PROJECT SIZE : 19000 SF <br /> PROJECT COST: $350,000 . 00 <br /> KEY PERSONNEL : Mark MacDonald, Project Executive; Jack MacDonald, Project Manager; Ron Rudner, <br /> Superintendent <br /> STAFF RESPONSIBILITIES : Ocean Gate General Contractors was hired for a challenging <br /> State Park located in Boca Grande, Florida. Ocean Gate 's responsibility Cayo Costa <br /> construction and installation of a restroom on an island. This particular project could <br /> only be accessed by water since no bridge was available. Ocean Gate met the challenge <br /> head on and was successful in creating the desired building with all plumbing, electrical, <br /> etc . in working order. This was definitely a defining moment for Ocean Gate in that we <br /> achieved the goals on time with quality results . <br />
The URL can be used to link to this page
Your browser does not support the video tag.