My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
View images
View plain text
NAME AND LOCATION : KISSIMMEE PRAIRIE STATE PARK <br /> CAMPGROUND AND RANGER RESIDENCES <br /> Kissimmee, Florida <br /> FIRM RESPONSIBILITY: General Contractor <br /> PROJECT OWNER : Florida Department of Environmental Protection <br /> Dallas Marshall <br /> 3900 Commonwealth Blvd. <br /> Tallahassee, Florida 32399 <br /> PH : 850 .488 . 5372 FX : 850 . 245 .2128 <br /> PROJECT ARCHITECT: Kelly and Kelly Architects <br /> Gary Kelly <br /> 119 SW 6th Street <br /> Stuart, Florida 34994 <br /> PH : 772 .283 . 3492 FX : 772 220 . 7310 <br /> PROJECT ENGINEER: Creech Engineers, Inc . <br /> Mark B . <br /> 2000 NE Jensen Beach Blvd. <br /> Stuart, Florida 34957 <br /> PH : 772 .283 . 1413 FX : 772 .220 . 7881 <br /> COMPLETION DATE : October 2001 <br /> PROJECT SIZE : 3 ,600 SF <br /> PROJECT COST: $1 ,400, 000 . 00 <br /> KEY PROFESSIONALS : Mark MacDonald, Project Executive; Sied Baniahmad, Project Manager; Gerald Parker, <br /> Superintendent <br /> STAFF RESPONSIBILITIES : Ocean Gate General Contractors was hired by the Florida Department of Environmental <br /> Protection to construct a new park ranger residence facility at Kissimmee Prairie State <br /> Park . We provided the labor and materials to construct an access road and parking, con- <br /> cession building, observation platform, bathhouse building, water treatment facility and <br /> well , water service distribution system and 35 campsites . Ocean Gate was responsible <br /> for: clearing and stripping the site area in preparation to build, termite control , sod and <br /> seed of lawn, pouring concrete, all carpentry work, installation of crimp sheet metal roof- <br /> ing with trim , painting, plumbing, ceramic wall tiling, flooring, carpet installation, and a <br /> heating and air conditioning unit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).