My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NAME AND LOCATION : OLETA RIVER STATE PARK <br /> North Miami, Florida <br /> FIRM RESPONSIBILITY: General Contractor <br /> PROJECT OWNER: Florida Department of Environmental Protection <br /> Michael Renard <br /> 3900 Commonwealth Blvd . <br /> Tallahassee, Florida 32399 <br /> PH : 850 .488 . 5372 FX : 850 .245 . 2128 <br /> PROJECT ARCHITECT: Florida DEP Bureau of Design and Recreation Services <br /> Fred Hand <br /> 3900 Commonwealth Blvd. <br /> Tallahassee , Florida 32399 <br /> PH : 850 . 488 . 5372 FX : 850 . 245 .2128 <br /> PROJECT ENGINEER: Registe Engineering Group, Inc . <br /> Jacques Registe <br /> 1427 N. Bronough St. <br /> Tallahassee, Florida 32303 <br /> PH : 850 . 894-4521 FX : 850 . 224 . 0505 <br /> COMPLETION DATE : May 2004 <br /> PROJECT SIZE % 29000 SF <br /> PROJECT COST: $3009000 . 00 <br /> KEY PROFESSIONALS : Mark MacDonald, Project Manager ; Chris Ludwig, Superintendent <br /> STAFF RESPONSIBILITIES : Ocean Gate General Contractors was hired to construct two new picnic pavilions <br /> at Oletta River State Park in North Miami , Florida. As experienced General Con- <br /> tractors working for the Florida Department of Environmental Protection, Ocean <br /> Gate paid strict attention to the surrounding area. Preservation of the environ- <br /> ment is important and we made sure that our crew was careful when constructing <br /> the picnic pavillions as not to damage the surrounding area. The project was <br /> completed on time with quality results . <br />
The URL can be used to link to this page
Your browser does not support the video tag.