15 . THE ELECTRICAL SERVICE AND UTILITY INFORMATION IS NOT OF SUFFICIENT DETAIL <br /> TO DETERMINE WORK REQUIRED , FOR NUMBER OF PHASES , SERVICE TO THE LIFT <br /> STATION , UTILITY RELOCATIONS , TELEPHONE LINES , AND COORDINATION WITH FPL. <br /> FPBL service extensions are shown on sheet U- 1. Underground utilities are indicated to the extent <br /> known. Be advised "Sunshine State One Call" no longer responds to requests for locates from <br /> surveyors or engineers. CONTRACTOR will have to locate and adjust the existing utilities in <br /> accordance with the notes on sheet U-2. FPBL was forwarded with service request information <br /> indicating revised design components. <br /> 16 . Mr. Davis, Director of Public Works, advised revisions to the lift station will be submitted to the <br /> bidders. The revisions essentially include a station with addition capacity. WILL THERE BEAN <br /> ADDITIONAL 10 DAYS FOR BIDDER REVIEW OF THE REVISED LIFT STATION BEFORE THE BID <br /> OPENING DATE? If necessary the bid date will be extended. As above the bid date has been <br /> extended. <br /> 17 , through 21 . ADDITIONAL QUESTIONS CONCERNING INSUFFICIENT INFORMATTION <br /> RELATIVE TO THE METER SOUTH OF THE WET WELL, NOTES ON U1 FOR CLARITY, <br /> WELL PERMIT , NO DETAIL DRAWINGS FOR THAT WORK, NO POINT OF POWER <br /> CONNECTION FOR LIFT STATION , HOW WILL POWER TO LIFT STATION BE <br /> PROVICED : AND NO RISER DETAIL. <br /> Regarding the power connection to the lift station and how power will be provided, the Contractor <br /> shall hire a licensed electrical contractor to design and connect the power service for the lift station. <br /> See attached Sheets U-1 REVISED, and additional DRAWING Sheet U-8A REVISED for details. These <br /> DRAWINGS SHALL BECOME A PART OF THE CONTRACT DOCUMENTS TOGETHER WITH <br /> DRAWINGS U-7 REVISED, U4 REVISED, AND OTHER DRAWINGS HEREIN, <br /> 22. NOTE : Mr. Davis advised the Wabasso Beach Park site is very busy with private businesses at the entrance <br /> along the north, and Disney activity to the south. It will be necessary to close the Park from time to time and <br /> divert patrons to the Golden Sands Park. Consequently safety and protection of the public is very important <br /> and will require the CONTRACTOR'S attention. <br /> Item 3 - Response to questions received after the February 28 , 2008 Prebid Conference : . <br /> 1 . SECTION 2 . 02 OF THE SPECIFICATIONS CALL FOR ALUMINUM WIRE , WILL ALUMINUM <br /> WIRE BE ALLOWED ON A BEACH FRONT PROJECT? <br /> Delete the reference to the use of aluminum wire and use copper wire only. <br /> 2 . SECTION 2. 09 METERING SPECIFICATIONS , SPECIFICATION SHOULD BE ALUMINUM <br /> METER SOCKET, NEC REQUIRES "ALL MATERIALS TO BE SUITABLE FOR THE <br /> LOCATION"? <br /> There is not a copper meter can. Project will require a standard aluminum meter can that can be <br /> used in a location near the beach. <br /> 3 . PLEASE PROVIDE SPECIFICATIONS FOR TIMECLOCKS . <br /> The time clock will be equal to an Intermatic T101P. <br /> 4 . THERE IS NO CIRCUIT SHOWN FOR EXHAUST FANS . <br /> The exhaust fans shall be tied into the lighting circuit in the appropriate bathroom. <br /> 5 . SHEET E1 . 01 , IS SCALE 1 " = 20'? <br /> The scale is incorrect on sheets E101. Correct scale is 1 " = 20 <br /> 6 , CONCRETE POLES , FIXTURE SCHEDULE CALLS FOR 12' AFG . WHAT IS THE TOTAL <br /> REQUIRED LENGTH OF THE POLE? WHAT ARE THE WIND LOAD REQUIREMENTS AND <br /> ARE LOAD CALCULATIONS AND ENGINEERING REQUIRED? <br /> CADocuments and SettingsUmarinolocal Settings\Temporary Internet Files\ContentOubook\ 3GUD33FE\Addendum #2.doc <br /> Page 4 of 11 Rev. 3A2-08 <br />