My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 . THE ELECTRICAL SERVICE AND UTILITY INFORMATION IS NOT OF SUFFICIENT DETAIL <br /> TO DETERMINE WORK REQUIRED , FOR NUMBER OF PHASES , SERVICE TO THE LIFT <br /> STATION , UTILITY RELOCATIONS , TELEPHONE LINES , AND COORDINATION WITH FPL. <br /> FPBL service extensions are shown on sheet U- 1. Underground utilities are indicated to the extent <br /> known. Be advised "Sunshine State One Call" no longer responds to requests for locates from <br /> surveyors or engineers. CONTRACTOR will have to locate and adjust the existing utilities in <br /> accordance with the notes on sheet U-2. FPBL was forwarded with service request information <br /> indicating revised design components. <br /> 16 . Mr. Davis, Director of Public Works, advised revisions to the lift station will be submitted to the <br /> bidders. The revisions essentially include a station with addition capacity. WILL THERE BEAN <br /> ADDITIONAL 10 DAYS FOR BIDDER REVIEW OF THE REVISED LIFT STATION BEFORE THE BID <br /> OPENING DATE? If necessary the bid date will be extended. As above the bid date has been <br /> extended. <br /> 17 , through 21 . ADDITIONAL QUESTIONS CONCERNING INSUFFICIENT INFORMATTION <br /> RELATIVE TO THE METER SOUTH OF THE WET WELL, NOTES ON U1 FOR CLARITY, <br /> WELL PERMIT , NO DETAIL DRAWINGS FOR THAT WORK, NO POINT OF POWER <br /> CONNECTION FOR LIFT STATION , HOW WILL POWER TO LIFT STATION BE <br /> PROVICED : AND NO RISER DETAIL. <br /> Regarding the power connection to the lift station and how power will be provided, the Contractor <br /> shall hire a licensed electrical contractor to design and connect the power service for the lift station. <br /> See attached Sheets U-1 REVISED, and additional DRAWING Sheet U-8A REVISED for details. These <br /> DRAWINGS SHALL BECOME A PART OF THE CONTRACT DOCUMENTS TOGETHER WITH <br /> DRAWINGS U-7 REVISED, U4 REVISED, AND OTHER DRAWINGS HEREIN, <br /> 22. NOTE : Mr. Davis advised the Wabasso Beach Park site is very busy with private businesses at the entrance <br /> along the north, and Disney activity to the south. It will be necessary to close the Park from time to time and <br /> divert patrons to the Golden Sands Park. Consequently safety and protection of the public is very important <br /> and will require the CONTRACTOR'S attention. <br /> Item 3 - Response to questions received after the February 28 , 2008 Prebid Conference : . <br /> 1 . SECTION 2 . 02 OF THE SPECIFICATIONS CALL FOR ALUMINUM WIRE , WILL ALUMINUM <br /> WIRE BE ALLOWED ON A BEACH FRONT PROJECT? <br /> Delete the reference to the use of aluminum wire and use copper wire only. <br /> 2 . SECTION 2. 09 METERING SPECIFICATIONS , SPECIFICATION SHOULD BE ALUMINUM <br /> METER SOCKET, NEC REQUIRES "ALL MATERIALS TO BE SUITABLE FOR THE <br /> LOCATION"? <br /> There is not a copper meter can. Project will require a standard aluminum meter can that can be <br /> used in a location near the beach. <br /> 3 . PLEASE PROVIDE SPECIFICATIONS FOR TIMECLOCKS . <br /> The time clock will be equal to an Intermatic T101P. <br /> 4 . THERE IS NO CIRCUIT SHOWN FOR EXHAUST FANS . <br /> The exhaust fans shall be tied into the lighting circuit in the appropriate bathroom. <br /> 5 . SHEET E1 . 01 , IS SCALE 1 " = 20'? <br /> The scale is incorrect on sheets E101. Correct scale is 1 " = 20 <br /> 6 , CONCRETE POLES , FIXTURE SCHEDULE CALLS FOR 12' AFG . WHAT IS THE TOTAL <br /> REQUIRED LENGTH OF THE POLE? WHAT ARE THE WIND LOAD REQUIREMENTS AND <br /> ARE LOAD CALCULATIONS AND ENGINEERING REQUIRED? <br /> CADocuments and SettingsUmarinolocal Settings\Temporary Internet Files\ContentOubook\ 3GUD33FE\Addendum #2.doc <br /> Page 4 of 11 Rev. 3A2-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.