Laserfiche WebLink
„ 16 . C4 , THE QUANTITIES GIVEN FOR NEW ASPHALT ARE INCONSISTENT WITH THE BID <br /> FORM . PLEASE VERIFY CORRECT QUANTITIES AND REVISE THE BID FORM <br /> ACCORDINGLY. <br /> Bid sheet has not been revised since bid quantity is equivalent to the total surface area of the <br /> proposed parking lot The CONTRACTOR will install 2. 5 inch layer of asphalt over -5, 660 sgft (628 <br /> syd) of new pavement and a 1 inch layer of asphalt over -15,850 sgft (1, 761 syd) of old pavement <br /> which is not proposed to be removed. Therefore, a total of 2390 syd of asphalt will be installed <br /> Within bid item 2.02 the CONTRACTOR will be responsible for all materials, equipment, and labor for <br /> the proper installation of the su"rade stabilization, base, asphalt, and required testing. <br /> Approximate cut and till quantities are shown on page C- 1. <br /> 17 . C-7 , PLEASE VERIFY THAT THE BOARDWALK COVERED ROOFS ARE TO RECEIVE <br /> SHINGLES IN LIEU OF METAL ROOFING TO MATCH THE RESTROOM AND PAVILIONS . <br /> CONTRACTOR shall provide metal roofing identical in type and installed as identified on the <br /> architectural and structural drawings In lieu of the shingle roofing shown on C4. <br /> 18 . U- 1 , THERE ARE TWO WATER METERS THAT ARE NOTED TO BE RELOCATED . IS THIS <br /> CORRECT, THAT THE METER OWNER (UTILITY) WILL DO THE RELOCATION ? <br /> The relocation of the two water meters Is included in the scope of work for this CONTRACT, see <br /> I L sheets UIREVISED and UBAREVISED. <br /> 19 , U- 1 , IF THE EXISTING WELLS AND IRRIGATION SYSTEM ARE TO BE ABANDONED BY THE <br /> CONTRACTOR PLEASE PROVIDE A DETAIL OF THE WORK INVOLVED . <br /> See notes provided on U8A REVISED for details. <br /> 20 . U - 1 , WILL THE CONTRACTOR BE REQUIRED TO INSTALL THE NEW WELL AND IRRIGATION <br /> WORK? IF SO PROVIDE A DETAIL. <br /> See notes provided on U-8A REVISED for details. <br /> 21 . U- 1 , WILL THE CONTRACTOR BE REQUIRED TO RELOCATE THE EXISTING TELEPHONE <br /> SERVICE? IF SO PROVIDE A DETAIL <br /> Contractor will be responsible to relocate all indicated utilities. See plan details, sheet U4 REVISED <br /> and U-8A REVISED. See Existing Utility notes on sheet U2. <br /> 22, U - 1 , REGUARDING THE FP&L 3 PHASE POWER EXTENSION , HAS FPL COMPLETED THIS <br /> WORK? <br /> No <br /> 23 . U - 1 , REGUARDING THE FPL 230 VOLT 3 PHASE BURIED SERVICE TO POLE , HAS FPL <br /> COMPLETED THIS WORK? <br /> The buried electric service is by CONTRACTOR. See site plan details sheet UIREVISED and notes <br /> on U7 REVISED. <br /> 24 , U7 , PLEASE PROVIDE ELECTRICAL SERVICE REQUIREMENTS FOR THE LIFT STATION <br /> THAT IS COMPATIBLE WITH SERVICE FOR ALL OTHER BUILDINGS AND SITE LIGHTING . <br /> N/A, lift station requires separate electric service and meter can. <br /> 25 . U -7 , LIFT STATION NOTE STATES , "SEE ELECTRICAL DRAWINGS FOR SERVICE <br /> REQUIREMENTS , ” PLEASE PROVIDE THIS INFORMATION . <br /> See notes on sheet U=1 REVISED and U8 REVISED. <br /> 26 . LA- 1 , IN THE TOP RIGHT CORNER, THE NOTE READS , " PROPOSED DUNE VEGETATION " , <br /> HAS THIS WORK BEEN COMPLED OR IS THE CONTRACTOR REQUIRED TO DO THIS <br /> WORK? IF INCLUDED IN THE CONTRACT PLEASE PROVIDE SPECIE AND QUANTITY. <br /> See Item 3 #15 above. <br /> CADocuments and SettingsUmadnolocal Settings\Temporary Internet Files\Content Outlook\BGUD33FE\Addendum #2.doc <br /> Page 6 & 11 Rev. 3-1248 <br />