Laserfiche WebLink
the CONTRACTOR shall provide effective protection for land and vegetation resources at all times as <br /> defined in the following subparagraphs. <br /> F - Work Area Limits: Prior to any construction, the CONTRACTOR shall mark the areas that are not required <br /> to accomplish all work to be performed under this contract. Isolated areas within the general work area <br /> which are to be saved and protected shall also be marked or fenced. Monuments and markers shall be <br /> protected before construction operations commence. The CONTRACTOR shall convey to its personnel the <br /> purpose of marking and/or protection of all necessary objects. <br /> G - Location of Storage and Other CONTRACTOR Facilities: Location of the CONTRACTOR 's field offices, <br /> staging areas, stockpile storage and temporary buildings shall be subject to the approval of the OWNER at <br /> the Pre-Construction Meeting. <br /> H - Disposal of Solid Wastes: Solid wastes (excluding clearing debris) shall be placed in containers which <br /> are emptied on a regular schedule. All handling and disposal shall be conducted to prevent contamination. <br /> I - Disposal of Chemical Waste: Chemical waste shall be stored in corrosion resistant <br /> containers, removed from the work area and disposed of in accordance with Federal, State <br /> and Local regulations. <br /> J - Disposal of Discarded Materials: Discarded materials other than those which can be <br /> included in the solid waste category shall be handled as directed by OWNER <br /> K - Protection of Water Resources: The CONTRACTOR shall keep construction activities under surveillance, <br /> management and control to avoid pollution of surface and ground waters. Special management techniques <br /> as set out below shall be implemented to control water pollution by the listed construction activities <br /> included in this contract. <br /> L - Oil Spill Prevention: The CONTRACTOR must. <br /> Prevent oil or other hazardous substances from entering the ground, drainage or local bodies of <br /> water. <br /> ❑ Provide containment, diversionary structures or equipment to prevent discharge oil from reaching <br /> a watercourse. <br /> C Take immediate action to contain and clean up any spill of oily substances, petroleum products <br /> and hazardous substances. <br /> ❑ Immediately report such spills to the OWNER. Absorbent materials capable of absorbing the <br /> contents of the largest single tank shall be kept on site. <br /> Fuel and oil storage tank installation must be constructed so that a secondary means of containment is <br /> provided for the entire contents of the largest single tank. Dikes and other means of containment is <br /> provided for the entire contents of the largest single tank. Dikes and other structures shall be impervious to <br /> spilled oil to prevent infiltration into the ground. Mobile or portable fuel storage tanks shall be positioned or <br /> located so as to provide a secondary containment identical to that required for non-mobile storage tanks. <br /> Storage tanks shall be located where they will not be subjected to flooding or washout. Fueling activities <br /> shall be limited to upland areas - no fueling or transfer of petroleum products shall take place on the beach <br /> M - Protection of Fish and Wildlife Resources: The CONTRACTOR shall keep construction activities under <br /> surveillance, management and control to minimize interference with, disturbance to and damage of fish and <br /> wildlife. <br /> N - Protection of Air Resources: The CONTRACTOR shall keep construction activities under surveillance, <br /> management and control to minimize pollution of air resources. All activities, equipment, processes and <br /> work operated or performed by the CONTRACTOR in accomplishing the specified construction shall be in <br /> strict accordance with the applicable air pollution standards of the State of Florida (Florida Statute, Chapter <br /> 403 and others) and all Federal emission and performance laws and standards. <br /> O - Protection of Sound Intrusions: The CONTRACTOR shall keep construction activities under surveillance <br /> and control to minimize damage to the environment by noise. <br /> CADocurnents and Settings\Irnarino\Local SetUngsWernporary Internet Files\Content.OuUook\BGUD33FEWddendum #2. doc <br /> Page 10 of 11 Rev. 3-12-08 <br />