My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and shall operate satisfactorily when installed. Pumps shall be manufactured in <br /> accordance with the Hydraulic Institute Standards, <br /> 3 . The control system shall be manufactured by a company with an established record <br /> of successful performance for similar products. <br /> 4. All equipment furnished under this specification shall be new and shall be the <br /> standard product of manufacturers having a successful record of manufacturing and <br /> servicing the equipment and systems specified herein for a minimum of five (5) <br /> years. <br /> 5 . The pumps shall be furnished complete with controls, and accessories required and <br /> shall be as manufactured by Flygt or ABS . <br /> 1 .04 SUBMITTALS <br /> A. Shop Drawings - The Contractor shall furnish the Engineer a minimum five (5) copies of <br /> shop drawings of the items listed below, prior to their delivery. This shall be done in <br /> accordance with the provisions of the General Conditions. <br /> 1 , Pumps <br /> 2 , Pump Accessories <br /> 3 , Access Covers <br /> 4, Control Panel and RTU <br /> 5 , Electrical Devices <br /> 6 . Precast Structures <br /> 7 , Poured In Place Concrete Design Mix <br /> B . Manufacturer's Data - The Contractor shall furnish the Engineer a minimum five (5) copies of <br /> manufacturer's data of the items listed below, prior to their delivery. <br /> 1 . Pipe <br /> 2, Fittings <br /> 3 . Joints and Restrainers <br /> 4, Plug Valve <br /> 5 , Check Valve <br /> 6. Quick Disconnect - <br /> C . Operation and Maintenance Data The Contractor shall furnish the Engineer three (3 ) sets <br /> of each of the following for each mechanical unit installed. <br /> 1 . Instructions <br /> 2 . Maintenance Manual <br /> 3 , Parts Lists <br /> 4, Wiring Diagrams <br /> 5 . Pump Performance Curves <br /> D . Operating Instructions and Service <br /> 1 . Three sets of operating and maintenance manuals shall be furnished. The manuals <br /> shall be prepared specifically for this installation and shall include all required cuts, <br /> drawings, equipment list, descriptions, etc . that are required to instruct operating and <br /> 02539 — Submersible Pump Station (Rev.) <br /> 02539-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.