My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACEE%IENT B <br /> CRITERIA FOR AUGER (CAST-IN-PLACE) PILE INSTALLATION <br /> The Righting of the auger used to form the piles should have a constant diameter that achieves <br /> the specified cross-section, and should be continuous from the auger head to tip. The center hole <br /> of the auger through which the grout is pumped should have a diameter of at least 3 inches . <br /> The auger head used to drive the flighting should have a minimum static weight of 4,000 pounds. <br /> It should be powered by a drive unit with at least 150 horsepower and a minimum rated torque of <br /> 9 ,000 foot-pounds . <br /> The piling leads should be prevented from rotating by a stabilizing arm attached to the crane or <br /> by firm embedment of the pile leads in the surficial soils. <br /> A positive displacement pump capable of developing a displacement pressure greater that 350 psi <br /> should be used to transport the grout to the augered hole . The pump should be provided with a <br /> gauge for monitoring pressure and a digital counter for measuring total grout volume. <br /> Each pile should be au ered and grouted in an uninterrupted sequence. <br /> Once the design <br /> penetration depth is reached, the auger should be withdrawn 0 . 5 to 1 foot while maintaining <br /> positive rotation. This position should be maintained until grout flow has reached the tip at <br /> which time the auger should be lowered into the bottom of the hole. <br /> The rate of grout mJ ection and auger withdrawal should be closely coordinated so that a positive <br /> gauge pressure is maintained at all times. A minimum head of 5 feet of grout should be provided <br /> above the auger tip during grouting. The auger should be raised with minimal rotation and with a <br /> continuous, steady rate of pull, which allows the required grout head to be maintained. <br /> The volume of grout per linear foot of pile should be at least 10 percent larger than that of the <br /> neat excavation. In no case should a pile with a grout volume less than the neat excavation <br /> volume be accepted. <br /> A sequence of pile installation should be used such that previously constructed, adjacent piles are <br /> not disturbed. We recommend that new piles not be installed within 6 diameters of freshly <br /> grouted piles until the grout in the existing piles has undergone initial. set and has been in place at <br /> least 6 hours. <br /> r <br /> A.M . Engineering and Testing, Inc . <br />