A. M. ENGINEERING AND TESTING, INC. <br /> ATTACHMENT A <br /> SITE PREPARATION and FILL PLACEMENT RECOMMENDATIONS <br /> I . General Site Preparation <br /> The construction area should be stripped of all topsoil, surface vegetation, trees, roots, debris and <br /> other deleterious matter within and five feet beyond the perimeter of the proposed building and <br /> in all paved areas . Areas to receive fill should be likewise stripped. Any holes or voids from tree <br /> roots, abandoned septic tanks, etc . should be filled as indicated in Section IV. We recommend <br /> that a representative of A. M. Engineering and Testing, Inc. inspect the stripped site prior to <br /> placing fill. (This can be done while monitoring the proof4olling as recommended below.) <br /> The cleared areas should then be proof4oiled and compacted with a 10-ton (minimum) vibratory <br /> roller operating at a "slow walk" speed. The vibratory compactor should make at least six <br /> overlapping passes over the entire cleared area, three passes in one direction and three more at a <br /> right angle to the first three passes . (When proof4olling areas with adjacent or nearby <br /> structures, refer to Section II.) Proof4olling helps to detect any soft or loose zones and buried <br /> debris. If unstable areas are encountered, the project engineer or the geotechnical consultant <br /> should be advised, the matter investigated and the problem resolved. Because the initial proof- <br /> rolling is very critical, we recommend that a representative of A. M. Engineering and <br /> Testing, Inc. monitor the operation. <br /> After proof4olling, the cleared areas should be compacted until the upper two feet of soil <br /> aclueve a density of at least 95 percent of the modified Proctor maximum dry density (ASTM D <br /> 1557). The compaction should be checked with field density tests. <br /> II. Where Vibratory Equipment May Affect Adiacent Structures <br /> Where the project site is located adjacent to existing structures that may be damaged by the <br /> operation of heavy vibratory rollers, the required densification should be achieved with <br /> alternative equipment. Loaders, heavy plate compactors, and "jumping jack ' type compactors <br /> have been used successfully. The densification procedure may need to be modified because of <br /> reduced capacity of the acceptable equipment. For example, since small plate compactors are <br /> generally effective only to a maximum depth of six to eight inches, thinner lifts will be required. <br /> III. Excavation and Backfilling <br /> Where excavation and backfilling are required, the soils should be removed to the specified <br /> depth. Soils that are suitable for use as fill should be stockpiled separately. The excavated <br /> surface should be compacted (as described in Section I) so that the upper two feet of the <br /> subgrade soil achieve a density of at least 95 percent of the modified Proctor maximum dry <br /> density (ASTM D 1557) . The compaction should be checked with field density tests . The site <br /> should then be filled to grade in compacted lifts as indicated in Section IV . <br /> i <br />