Laserfiche WebLink
i <br /> SECTION 00520 = AGREEMENT <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of <br /> Florida organized and existing under the Laws of the State of Florida , (hereinafter called OWNER) <br /> and D C.L G, 2 `+,! Giant! ic � Lbn - ca - ccni i T1_'1�! <br /> (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , agree as <br /> follows : <br /> ARTICLE 1 = WORK <br /> 1 . 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents , <br /> The Work is generally described as follows: <br /> Construction of Public Park Facilities , Boardwalks , Benches , <br /> Restrooms , Picnic Pavilions , Site Work, Paving , Walks , Landscape , Lift Station , <br /> Site Lighting , Electrical Work, and Related Incidentals . <br /> ARTICLE 2 - THE PROJECT <br /> 2 . 01 The Project for which the Work under the Contract Documents may be the whole or only a part <br /> is generally described as follows: <br /> Project Name : Wabasso Beach Park Restoration <br /> County Project Number: 0612 <br /> Project Address : 1820 93`d Street, Vero Beach , FL 32963 <br /> ARTICLE 3 — ENGINEER <br /> 3 . 01 The Indian River County Public Works Department or it's representative is hereinafter called <br /> the ENGINEER and will act as OWNER's representative , assume all duties and <br /> responsibilities , and have the rights and authority assigned to ENGINEER in the Contract <br /> Documents in connection with the completion of the Work in accordance with the Contract <br /> Documents and as defined in Supplementary Conditions SC- 1 . 01 A. 20 . <br /> ARTICLE 4 - - CONTRACT TIMES <br /> 4 . 01 Time of the Essence <br /> A. All time limits for Milestones , if any, Substantial Completion , and completion and readiness for <br /> final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4 . 02 Days to Achieve Substantial Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 180"' calendar day after the date <br /> when the Contract Times commence to run as provided in paragraph 2 . 03 of the General <br /> Conditions (and Supplementary Conditions if applicable) , and completed and ready for final <br /> IL Last Revision 12/2007 00520m2 Wabasso Beach Pk, Restoration <br /> F:\Public Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9-2008\Div 0 AS OF 1 -8- <br /> 2008\00520 - Agreement (Public Works).doc <br />