My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (6)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:45:09 AM
Creation date
10/1/2015 12:21:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Project Number
2008032
Supplemental fields
SmeadsoftID
7471
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approach to Project <br /> Through Ocean Gate' s previous experiences with similar design/build construction projects both <br /> public and private, we have been able to develop a proven system to provide a highly efficient <br /> design and construction process to achieve the goals and visions of our clients while at the same <br /> time developing a lasting working relationship for the future. Ocean Gate recognizes that the <br /> foundation of the design/build nature of a project begins by communicating with the client <br /> ultimately allowing us to deliver the expectations as outlined in this request for qualifications . <br /> Preconstruction <br /> This process will begin with the Preconstruction Team and the Architect meeting to develop a <br /> clear vision as to the established goals, requirements and expectations of the Owner. During <br /> these initial meetings we will establish that the "Scope of Work" is understood by each of the <br /> individuals responsible for the successful completion of this Project. After evaluating the <br /> it criteria, we will present our proposal of the most attractive building systems option, initial cost <br /> and life cycle cost option to the Owner. We will make recommendations based on our <br /> knowledge of the local building conditions, economy, esthetic preference and past experience of <br /> working with the Owner. <br /> Upon being selected for construction of this Project, we will then work together with the Owner <br /> to create a detailed set of Construction Drawings. These drawings will start out as basic <br /> conceptual drawings and progress to a level of detail that will enable construction of an Owner <br /> accepted building while minimizing the possibility of future change orders . Prior to the <br /> "Construction Drawings" being approved, the "Scope of Work," provided upon being short listed <br /> for this Project, will be reviewed by both the Owner and the Contractor to ensure that there are <br /> no gaps in interpretation of the requirements. We will also use these meetings to present options <br /> to value engineer the Project based upon conversations with the Owner that is contractually <br /> prohibited prior to this point. <br /> Ocean Gate General Contractors, Inc . considers this period of time, prior to Construction <br /> Drawings, the most appropriate time to address the issue of the quality versus cost. By <br /> presenting specific option scenarios and identifying which items are of priority, Ocean Gate will <br /> work with the Owner to insure that a superior level of quality is achieved in area' s prioritized by <br /> the Owner while maintaining an overall high standard and staying within the budget parameters . <br /> This process is achieved through the submittal process . Every finish and mechanical component <br /> to be utilized in the construction progression will go through a series of submittal packages given <br /> to the Owner. The submittals will give a clear vision of exactly the type of component that is <br /> proposed to be utilized in the construction of the building for the Owners to review and comment <br /> upon. The submittal process allows the Owner to play an active ongoing role in the progression <br /> of the construction process while maintaining a high level of selection standards . The submitting <br /> and acceptance of these submittals during the design phase will play an invaluable part in <br /> eliminating delays that are often unnecessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.