My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> NOTE : SOME OF THE GENERAL CONDITIONS HAVE BEEN MODIFIED BY THE SUPPLEMENTARY <br /> C60NDITIONS. IN THESE INSTANCES, THE SECTIONS OF THE GENERAL CONDITIONS SO MODIFIED <br /> HAVE BEEN DENOTED HEREIN FOR THE CONTRACTOR' S CONVENIENCE . REFER TO THE <br /> SUPPLEMENTARY CONDITIONS FOR THE MODIFIED LANGUAGE . <br /> ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br /> 8 . Bonds--Performance and payment bonds and <br /> other instruments of security. <br /> 1 . 01 Defined Terms <br /> 9. Change Order--A document recommended by <br /> A. Wherever used in the Contract Documents and ENGINEER which is signed by CONTRACTOR and <br /> printed with initial or all capital letters, the terms listed OWNER and authorizes an addition, deletion, or revision <br />in <br /> below will have the meanings indicated which are the Work or an adjustment in the Contract Price or the <br /> applicable to both the singular and plural thereof. Contract Times, issued on or after the Effective Date of the <br /> Agreement. <br /> 1 . Addenda--Written or graphic instruments <br /> issued prior to the opening of Bids which clarify, correct, or 10. Claim--A demand or assertion by OWNER or <br /> change the Bidding Requirements or the Contract CONTRACTOR seeking an adjustment of Contract Price or <br /> Documents. Contract Times, or both, or other relief with respect to the <br /> terms of the Contract. A demand for money or services by a <br /> 2 . Agreement--The written instrument which is third party is not a Claim. <br /> evidence of the agreement between OWNER and <br /> CONTRACTOR covering the Work. 11 . Contract--The entire and integrated written <br /> agreement between the OWNER and CONTRACTOR <br /> 3 . Application for Payment--The form concerning the Work. The Contract supersedes prior <br /> acceptable to ENGINEER which is to be used by CON- negotiations, representations, or agreements, whether <br /> TRACTOR during the course of the Work in requesting written or oral. <br /> progress or final payments and which is to be accompanied <br /> by such supporting documentation as is required by the 12. Contract Documents--The Contract Docu- <br /> Contract Documents. ments establish the rights and obligations of the parties and <br /> include the Agreement, Addenda (which pertain to the Con- <br /> 4 . Asbestos--Any material that contains more tract Documents), CONTRACTOR' s Bid (including docu- <br /> than one percent asbestos and is friable or is releasing mentation accompanying the Bid and any post Bid <br /> asbestos fibers into the air above current action levels documentation submitted prior to the Notice <br />of Award) <br /> established by the United States Occupational Safety and when attached as an exhibit to the Agreement, the Notice to <br /> Health Administration. Proceed, the Bonds, these General Conditions, the <br /> Supplementary Conditions, the Specifications and the <br /> 5 . Bid--The offer or proposal of a bidder submit- Drawings as the same are more specifically identified in the <br /> ted on the prescribed form setting forth the prices for the Agreement, together with all Written Amendments, Change <br /> Work to be performed. Orders, Work Change Directives, Field Orders, and <br /> ENGINEER' s written interpretations and clarifications <br /> 6. Bidding Documents--The Bidding issued on or after the Effective Date of the Agreement. <br /> Requirements and the proposed Contract Documents (in- Approved Shop Drawings and the reports and drawings of <br /> cluding all Addenda issued prior to receipt of Bids) . subsurface and physical conditions are not Contract <br /> Documents. Only printed or hard copies of the items listed <br /> 7 . Bidding Requirements--The Advertisement or in this paragraph are Contract Documents. Files in <br /> Invitation to Bid, Instructions to Bidders, ' Bid security form, electronic media format of text, data, graphics, and the like <br /> if any, and the Bid form with any supplements. <br /> 00700-6 <br /> Standard General Conditions of the Construction Contract Rev . 12/2007 Wabasso Beach Pk . Restoration <br />
The URL can be used to link to this page
Your browser does not support the video tag.