My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 12:44:33 PM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that may be famished by OWNER to CONTRACTOR are <br />not Contract Documents, <br />13. Contract Price --The moneys payable by <br />OWNER to CONTRACTOR for completion of the Work in <br />accordance with the Contract Documents as stated in the <br />Agreement (subject to the provisions of paragraph 11.03 in <br />the case of Unit Price Work). <br />14. Contract Times --The number of days or the <br />dates stated in the Agreement to: (i) achieve Substantial <br />Completion; and (ii) complete the Work so that it is ready <br />for final payment as evidenced by ENGINEER's written <br />recommendation of final payment. <br />A new sentence has been added at the end of Paragraph <br />1.01.A.15. Seethe Supplementary Conditions. <br />15. CONTRACTOR --The individual or entity with <br />whom OWNER has entered into the Agreement. <br />16. Cost of the Work --See paragraph I L0 LA for <br />definition. <br />17. Drawings --That part of the Contract <br />Documents prepared or approved by ENGINEER which <br />graphically shows the scope, extent, and character of the <br />Work to be performed by CONTRACTOR. Shop <br />Drawings and other CONTRACTOR submittals are not <br />Drawings as so defined. <br />18. Effective Date of the Agreement --The date <br />indicated in the Agreement on which it becomes effective, <br />but if no such date is indicated, it means the date on which <br />the Agreement is signed and delivered by the last of the two <br />parties to sign and deliver. <br />19. ENGINEER --The individual or entity named <br />as such in the Agreement. <br />New language has been added to Paragraph 1.01.A.20 <br />See the Supplementary Conditions. <br />20. ENGINEER's Consultant --An individual or <br />entity having a contract with ENGINEER to finnish <br />services as ENGINEER's independent professional <br />associate or consultant with respect to the Project and who <br />is identified as such in the Supplementary Conditions, <br />21. Field Order --A written order issued by <br />ENGINEER which requires minor changes in the Work but <br />which does not involve a change in the Contract Price or the <br />Contract Times, <br />22. General Requirements --Sections of Division <br />1 of the Specifications. The General Requirements pertain <br />to all sections of the Specifications. <br />Rev. 03/2006 Egret Marsh <br />23. Hazardous Environmental Condition --The <br />presence at the Site of Asbestos, PCBs, Petroleum, <br />Hazardous Waste, or Radioactive Material in such <br />quantities or circumstances that may present a substantial <br />danger to persons or property exposed thereto in connection <br />with the Work. <br />24, Hazardous Waste --The term Hazardous <br />Waste shall have the meaning provided in Section 1004 of <br />the Solid Waste Disposal Act (42 USC Section 6903) as <br />amended from time to time. <br />25. Laws and Regulations; Laws or Regulations -- <br />Any and all applicable laws, rules, regulations, ordinances, <br />codes, and orders of any and all governmental bodies, <br />agencies, authorities, and courts having jurisdiction. <br />26. Liens --Charges, security interests, or <br />encumbrances upon Project funds, real property, or personal <br />property. <br />27. Milestone --A principal event specified in the <br />Contract Documents relating to an intermediate completion <br />date or time prior to Substantial Completion of all the <br />Work. <br />28. Notice of Award --The written notice by <br />OWNER to the apparent successful bidder stating that upon <br />timely compliance by the apparent successful bidder with <br />the conditions precedent listed therein, OWNER will sign <br />and deliver the Agreement. <br />29. Notice to Proceed --A written notice given by <br />OWNER to CONTRACTOR fixing the date on which the <br />Contract Times will commence to run and on which <br />CONTRACTOR shall start to perform the Work under the <br />Contract Documents, <br />Paragraph 1.01.A.30 has been modified as noted. <br />30. OWNER --The individual, entity, public body, <br />or authority with whom CONTRACTOR has entered into <br />the Agreement and for whom the Work is to be performed <br />and as specified in Exhibit `B" Florida Department of <br />Environmental Protection Supplementary Conditions <br />Article 1 Definitions. paragraph 1.1.17. <br />31. Partial Utilization --Use by OWNER of a <br />substantially completed part of the Work for the purpose for <br />which it is intended (or a related purpose) prior to <br />Substantial Completion of all the Work. <br />32. PCBs --Polychlorinated biphenyls. <br />33. Petroleum --Petroleum, including crude oil or <br />any fraction thereof which is liquid at standard conditions of <br />temperature and pressure (60 degrees Fahrenheit and 14.7 <br />pounds per square inch absolute), such as oil, petroleum, <br />00700-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.