fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil
<br />mixed with other non -Hazardous Waste and crude oils.
<br />Paragraph 1.01.A.34 has been modified as noted.
<br />34. Project --The total construction of which the
<br />Work to be performed under the Contract Documents may
<br />be the whole, or a part as may be indicated elsewhere in the
<br />Contract Documents and as specified in Exhibit `B" Florida
<br />Department of Environmental Protection Supplementary
<br />Conditions Article 1 Definitions, paragraph 1.1.18.
<br />35. Project Manual --The bound documentary
<br />information prepared for bidding and constructing the
<br />Work. A listing of the contents of the Project Manual,
<br />which may be bound in one or more volumes, is contained
<br />in the table(s) of contents.
<br />36. Radioactive Material --Source, special nucle-
<br />ar, or byproduct material as defined by the Atomic Energy
<br />Act of 1954 (42 USC Section 2011 et seq.) as amended
<br />from time to time.
<br />37. Resident Project Representative --The autho-
<br />rized representative of ENGINEER who may be assigned to
<br />the Site or any part thereof.
<br />38. Samples --Physical examples of materials,
<br />equipment, or workmanship that are representative of some
<br />portion of the Work and which establish the standards by
<br />which such portion of the Work will be judged.
<br />39. Shop Drawings --All drawings, diagrams,
<br />illustrations, schedules, and other data or information,which
<br />are specifically prepared or assembled by or for CON-
<br />TRACTOR and submitted by CONTRACTOR to illustrate
<br />some portion of the Work.
<br />40. Site --Lands or areas indicated in the Contract
<br />Documents as being furnished by OWNER upon which the
<br />Work is to be performed, including rights-of-way and
<br />easements for access thereto, and such other lands furnished
<br />by OWNER which are designated for the use of
<br />CONTRACTOR.
<br />41. Specifications --That part of the Contract
<br />Documents consisting of written technical descriptions of
<br />materials, equipment, systems, standards, and workmanship
<br />as applied to the Work and certain administrative details
<br />applicable thereto.
<br />42. Subcontractor—An individual or entity having
<br />a direct contract with CONTRACTOR or with any other
<br />Subcontractor for the performance of a part of the Work at
<br />the Site.
<br />Rev, 03/2006 Egret Marsh
<br />43. Substantial Completion --The time at which
<br />the Work (or a specified part thereof) has progressed to the
<br />point where, in the opinion of ENGINEER, the Work (or a
<br />specified part thereof) is sufficiently complete, in
<br />accordance with the Contract Documents, so that the Work
<br />(or a specified part thereof) can be utilized for the purposes
<br />for which it is intended. The terms "substantially complete"
<br />and "substantially completed" as applied to all or part of the
<br />Work refer to Substantial Completion thereof.
<br />44. Supplementary Conditions --That part of the
<br />Contract Documents which amends or supplements these
<br />General Conditions.
<br />45. Supplier --A manufacturer, fabricator, suppli-
<br />er, distributor, materialman, or vendor having a direct
<br />contract with CONTRACTOR or with any Subcontractor to
<br />furnish materials or equipment to be incorporated in the
<br />Work by CONTRACTOR or any Subcontractor.
<br />46. Underground Facilities --All underground
<br />pipelines, conduits, ducts, cables, wires, manholes, vaults,
<br />tanks, tunnels, or other such facilities or attachments, and
<br />any encasements containing such facilities, including those
<br />that convey electricity, gases, steam, liquid petroleum
<br />products, telephone or other communications, cable
<br />television, water, wastewater, storm water, other liquids or
<br />chemicals, or traffic or other control systems.
<br />47. Unit Price Work --Work to be paid for on the
<br />basis of unit prices.
<br />48. Work --The entire completed construction or
<br />the various separately identifiable parts thereof required to
<br />be provided under the Contract Documents. Work includes
<br />and is the result of performing or providing all labor,
<br />services, and documentation necessary to produce such
<br />construction, and furnishing, installing, and incorporating
<br />all materials and equipment into such construction, all as
<br />required by the Contract Documents.
<br />49. Work Change Directive --A written statement
<br />to CONTRACTOR issued on or after the Effective Date of
<br />the Agreement and signed by OWNER and recommended
<br />by ENGINEER ordering an addition, deletion, or revision
<br />in the Work, or responding to differing or unforeseen
<br />subsurface or physical conditions under which the Work is
<br />to be performed or to emergencies. A Work Change
<br />Directive will not change the Contract Price or the Contract
<br />Times but is evidence that the parties expect that the change
<br />ordered or documented by a Work Change Directive will be
<br />incorporated in a subsequently issued Change Order
<br />following negotiations by the parties as to its effect, if any,
<br />on the Contract Price or Contract Times.
<br />00700-8