Laserfiche WebLink
and safety precautions and programs incident C. Possible Price and Times Adjustments <br /> thereto; or <br /> 1 . The Contract Price or the Contract <br /> 21 other data, interpretations, opinions, and Times, or both, will be equitably adjusted to the <br /> information contained in such reports or shown or extent that the existence of such differing subsurface <br /> indicated in such drawings; or or physical condition causes an increase or decrease <br /> in CONTRACTOR's cost of, or time required for, <br /> 3 . any CONTRACTOR interpretation of or performance of the Work; subject, however, to the <br /> conclusion drawn from any "technical data" or any following : <br /> such other data, interpretations, opinions, or infor- <br /> mation. a. such condition must meet any one or <br /> more of the categories described in paragraph <br /> New Paragraphs 4.02.0 and 4.02 .D have been added. 4 .03 .A; and <br /> See the Supplementary Conditions. <br /> b. with respect to Work that is paid for on a <br /> 4 . 03 Differing Subsurface or Physical Conditions Unit Price Basis, any adjustment in Contract <br /> Price will be subject to the provisions of para- <br /> A. Notice: If CONTRACTOR believes that any graphs 9. 08 and 11 .03 , <br /> subsurface or physical condition at or contiguous to the Site <br /> that is uncovered or revealed either: 2 . CONTRACTOR shall not be entitled to <br /> any adjustment in the Contract Price or Contract <br /> 1 , is of such a nature as to establish that any Times if <br /> "technical data" on which CONTRACTOR is <br /> entitled to rely as provided in paragraph 4 .02 is a. CONTRACTOR knew of the existence <br /> materially inaccurate; or of such conditions at the time CONTRACTOR <br /> made a final commitment to OWNER in respect <br /> 21 is of such a nature as to require a change of Contract Price and Contract Times by the <br /> in the Contract Documents; or submission of a Bid or becoming bound under a <br /> negotiated contract; or <br /> 3 . differs materially from that shown or <br /> indicated in the Contract Documents; or b. the existence of such condition could <br /> reasonably have been discovered or revealed as a <br /> 4 . is of an unusual nature, and differs result of any examination, investigation, explo- <br /> materially from conditions ordinarily encountered ration, test, or study of the Site and contiguous <br /> and generally recognized as inherent in work of the areas required by the Bidding Requirements or <br /> character provided for in the Contract Documents; Contract Documents to be conducted by or for <br /> CONTRACTOR prior to CONTRACTOR's <br /> then CONTRACTOR shall, promptly after becoming aware making such final commitment; or <br /> thereof and before further disturbing the subsurface or <br /> physical conditions or performing any Work in connection c. CONTRACTOR failed to give the <br /> therewith (except in an emergency as required by paragraph written notice within the time and as required by <br /> 6. 16.A), notify OWNER and ENGINEER in writing about paragraph 4.03 .A. <br /> such condition. CONTRACTOR shall not fiuther disturb <br /> such condition or perform any Work in connection Part of the second sentence of Paragraph 4.03.C.3 has <br /> therewith (except as aforesaid) until receipt of written order been deleted. <br /> to do so. 3 . If OWNER and CONTRACTOR are <br /> B . ENGINEER 'S Review: After receipt of written <br /> unable to agree on entitlement to or on the amount <br /> or extent, if any, of any adjustment in the Contract <br /> notice as required by paragraph 4.03 .A, ENGINEER will Price or Contract Times, or both, a Claim may be <br /> promptly review the pertinent condition, determine the made therefor as provided in paragraph <br /> 10.05 . <br /> necessity of OWNER's obtaining additional exploration or However, OWNER, ENGINEER, and <br /> tests with respect thereto, and advise OWNER in writing ENGINEER'S Consultants shall not be liable to <br /> (with a copy to CONTRACTOR) of ENGINEER's findings CONTRACTOR for any claims, costs, losses, or <br /> and conclusions. damages (including but not limited to all fees and <br /> charges of engineers, architects, attorneys, and other <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 13 <br />