My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> professionals and all court or Underground Facility. During such time, <br /> dispute resolution costs) sustained by CONTRACTOR shall be responsible for the safety <br /> CONTRACTOR on or in connection with any other and protection of such Underground Facility. <br /> project or anticipated project. <br /> 2 . If ENGINEER concludes that a change in <br /> 4.04 Underground Facilities the Contract Documents is required, a Work Change <br /> Directive or a Change Order will be issued to reflect <br /> A. Shown or Indicated: The information and data and document such consequences. An equitable <br /> shown or indicated in the Contract Documents with respect adjustment shall be made in the Contract Price or <br /> to existing Underground Facilities at or contiguous to the Contract Times, or both, to the extent that they are <br /> Site is based on information and data furnished to OWNER attributable to the existence or location of any <br /> or ENGINEER by the owners of such Underground Facili- Underground Facility that was not shown or <br /> ties, including OWNER, or by others. Unless it is otherwise indicated or not shown or indicated with reasonable <br /> expressly provided in the Supplementary Conditions: accuracy in the Contract Documents and that <br /> CONTRACTOR did not know of and could not <br /> 1 . OWNER and ENGINEER shall not be reasonably have been expected to be aware 'of or to <br /> responsible for the accuracy or completeness of any have anticipated. If OWNER and CONTRACTOR <br /> such information or data; and are unable to agree on entitlement to or on the <br /> amount or extent, if any, of any such adjustment in <br /> 2 . the cost of all of the following will be Contract Price or Contract Times, OWNER or <br /> included in the Contract Price, and CONTRACTOR CONTRACTOR may make a Claim therefor as <br /> shall have full responsibility for: provided in paragraph 10.05 . <br /> a. reviewing and checking all such informa- 4 . 05 Reference Points <br /> tion and data, <br /> A. OWNER shall provide engineering surveys to <br /> b. locating all Underground Facilities establish reference points for construction which in <br /> shown or indicated in the Contract Documents, ENGINEER' s judgment are necessary to enable CON- <br /> TRACTOR to proceed with the Work. CONTRACTOR <br /> C, coordination of the Work with the shall be responsible for laying out the Work, shall protect <br /> owners of such Underground Facilities, and preserve the established reference points and property <br /> including OWNER, during construction, and monuments, and shall make no changes or relocations <br /> without the prior written approval of OWNER. <br /> d, the safety and protection of all such CONTRACTOR shall report to ENGINEER whenever any <br /> Underground Facilities and repairing any reference point or property monument is lost or destroyed or <br /> damage thereto resulting from the Work. requires relocation because of necessary changes in grades <br /> or locations, and shall be responsible for the accurate <br /> B . Not Shown or Indicated replacement or relocation of such reference points or <br /> property monuments by professionally qualified personnel. <br /> 1 . If an Underground Facility is uncovered <br /> or revealed at or contiguous to the Site which was 4 .06 Hazardous Environmental Condition at Site <br /> not shown or indicated, or not shown or indicated <br /> with reasonable accuracy in the Contract A. Reports and Drawings: Reference is made to the <br /> Documents, CONTRACTOR shall, promptly after Supplementary Conditions for the identification of those <br /> becoming aware thereof and before fii Cher reports and drawings relating to a Hazardous Environmental <br /> disturbing conditions affected thereby or performing Condition identified at the Site, if any, that have been <br /> any Work in connection therewith (except in an utilized by the ENGINEER in the preparation of <br /> the <br /> emergency as required by paragraph 6. 16.A), Contract Documents. <br /> identify the owner of such Underground Facility and <br /> give written notice to that owner and to OWNER B . Limited Reliance by CONTRACTOR on Technical <br /> and ENGINEER. ENGINEER will promptly review Data Authorized: CONTRACTOR may rely upon the <br /> the Underground Facility and determine the extent, general accuracy of the "technical data" contained in such <br /> if any, to which a change is required in the Contract reports and drawings, but such reports and drawings are not <br /> Documents to reflect and document the Contract Documents. Such "technical data" is identified in <br /> consequences of the existence or location of the the Supplementary Conditions . Except for such reliance on <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.