Laserfiche WebLink
B . CONTRACTOR shall comply with all applicable 6 . 16 Emergencies <br /> Laws and Regulations relating to the safety of persons or <br /> property, or to the protection of persons or property from A. In emergencies affecting the safety or protection of <br /> damage, injury, or loss; and shall erect and maintain all persons or the Work or property at the Site <br /> or adjacent ; <br /> necessary safeguards for such safety and protection. thereto, CONTRACTOR is obligated to act to prevent <br /> CONTRACTOR shall notify owners of adjacent property threatened damage, injury, or loss. CONTRACTOR shall <br /> and of Underground Facilities and other utility owners when give ENGINEER prompt written notice if CONTRACTOR <br /> prosecution of the Work may affect them, and shall believes that any significant changes in <br /> the Work or <br /> cooperate with them in the protection, removal, relocation, variations from the Contract Documents have been caused <br /> and replacement of their property. All damage, injury, or thereby or are required as a result thereof. If ENGINEER <br /> loss to any property referred to in paragraph 6. 13 .A.2 or determines that a change in the Contract Documents <br /> is <br /> 6. 13 .A.3 caused, directly or indirectly, in whole or in part, required because of the action taken by CONTRACTOR in <br /> by CONTRACTOR, any Subcontractor, Supplier, or any response to such an emergency, a Work Change Directive <br /> other individual or entity directly or indirectly employed by or Change Order will be issued, <br /> any of them to perform any of the Work, or anyone for <br /> whose acts any of them may be liable, shall be remedied by 6 . 17 Shop Drawings and Samples <br /> CONTRACTOR at no expense to OWNER (except damage <br /> or loss attributable to the fault of Drawings or Specifications A. CONTRACTOR shall submit Shop Drawings to <br /> or to the acts or omissions of OWNER or ENGINEER or ENGINEER for review and approval in accordance with the <br /> ENGINEER' s Consultant, or anyone employed by any of acceptable schedule of Shop Drawings and Sample <br /> them, or anyone for whose acts any of them may be liable, submittals. All submittals will be identified as ENGINEER <br /> and not attributable, directly or indirectly, in whole or in may require and in the number of copies specified <br /> in the <br /> part, to the fault or negligence of CONTRACTOR or any General Requirements. The data shown on the Shop <br /> Subcontractor, Supplier, or other _ individual or entity Drawings will be complete with respect to quantities, <br /> directly or indirectly employed by any of them). All dimensions, specified performance and design criteria, <br /> damage_injurv. or loss to any property referred to in materials, and similar data to show ENGINEER <br /> the <br /> paragraph 6. 13 .A.2 caused by disasters, including but not services, materials, and equipment CONTRACTOR <br /> limited to hurricanes, tornadoes, floods, fires, abnormal proposes to provide and to enable ENGINEER to review <br /> weather conditions, or acts of God shall be remedied by the information for the limited purposes required <br /> by <br /> CONTRACTOR at no expense to OWNER. paragraph 6. 17 .E. <br /> CONTRACTOR' s duties and responsibilities for safety and <br /> for protection of the Work shall continue until such time as B . CONTRACTOR shall also submit Samples to <br /> all the Work is completed and ENGINEER has issued a ENGINEER for review and approval in accordance with the <br /> notice to OWNER and CONTRACTOR in accordance with acceptable schedule of Shop Drawings and Sample <br /> paragraph 14 .07 .B that the Work is acceptable (except as submittals. Each Sample will be identified clearly as <br /> to <br /> otherwise expressly provided in connection with Substantial material, Supplier, pertinent data such as catalog numbers, <br /> Completion). and the use for which intended and otherwise as ENGI- <br /> NEER may require to enable ENGINEER to review the <br /> 6. 14 Safety Representative submittal for the limited purposes required by paragraph <br /> 6. 17.E. The numbers of each Sample to be submitted will <br /> A. CONTRACTOR shall designate a qualified and be as specified in the Specifications, <br /> experienced safety representative at the Site whose duties <br /> and responsibilities shall be the prevention of accidents and C. Where a Shop Drawing or Sample is required by <br /> the maintaining and supervising of safety precautions and the Contract Documents or the schedule of Shop Drawings <br /> programs. and Sample submittals acceptable to ENGINEER as <br /> required by paragraph 2 .07, any related Work performed <br /> 6 . 15 Hazard Communication Programs prior to ENGINEER' s review and approval of the pertinent <br /> submittal will be at the sole expense and responsibility of <br /> A. CONTRACTOR shall be responsible for coordi- CONTRACTOR. <br /> nating any exchange of material safety data sheets or other <br /> hazard communication information required to be made D . Submittal Procedures <br /> available to or exchanged between or among employers at <br /> the Site in accordance with Laws or Regulations. 1 . Before submitting each Shop Drawing or <br /> Sample, CONTRACTOR shall have determined and <br /> verified: <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 25 <br />