My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . ENGINEER' s review and approval will <br /> a. all field measurements, quantities, dimen- not extend to means, methods, techniques, <br /> sions, specified performance criteria, installation sequences, or procedures of construction (except <br /> requirements, materials, catalog numbers, and where a particular means, method, technique, <br /> similar information with respect thereto; sequence, or procedure of construction is <br /> specifically and expressly called for by the Contract <br /> b. all materials with respect to intended use, Documents) or to safety precautions or programs <br /> fabrication, shipping, handling, storage, assem- incident thereto. The review and approval of a <br /> bly, and installation pertaining to the perfor- separate item as such will not indicate approval of <br /> mance of the Work; the assembly in which the item functions. <br /> c . all information relative to means, meth- 3 . ENGINEER' s review and approval of <br /> ods, techniques, sequences, and procedures of Shop Drawings or Samples shall not relieve CON- <br /> construction and safety precautions and TRACTOR from responsibility for any variation <br /> programs incident thereto; and from the requirements of the Contract Documents <br /> unless CONTRACTOR has in writing called <br /> d. CONTRACTOR shall also have ENGINEER' s attention to each such variation at the <br /> reviewed and coordinated each Shop Drawing or time of each submittal as required by paragraph <br /> Sample with other Shop Drawings and Samples 6. 17 .D.3 and ENGINEER has given written <br /> and with the requirements of the Work and the approval of each such variation by specific written <br /> Contract Documents. notation thereof incorporated in or accompanying <br /> the Shop Drawing or Sample approval; nor will any <br /> 2. Each submittal shall bear a stamp or approval by ENGINEER relieve CONTRACTOR <br /> specific written indication that CONTRACTOR has from responsibility for complying with the require- <br /> satisfied CONTRACTOR' s obligations under the ments of paragraph 6. 17 .D. 1 . <br /> Contract Documents with respect to <br /> CONTRACTOR's review and approval of that F. Resubmittal Procedures <br /> submittal. <br /> 1 . CONTRACTOR shall make corrections <br /> 3 . At the time of each submittal, CON- required by ENGINEER and shall return the <br /> TRACTOR shall give ENGINEER specific written required number of corrected copies of Shop <br /> notice of such variations, if any, that the Shop Draw- Drawings and submit as required new Samples for <br /> ing or Sample submitted may have from the require- review and approval. CONTRACTOR shall direct <br /> ments of the Contract Documents, such notice to be specific attention in writing to revisions other than <br /> in a written communication separate from the the corrections called for by ENGINEER on previ- <br /> submittal; and, in addition, shall cause a specific ous submittals. <br /> notation to be made on each Shop Drawing and <br /> Sample submitted to ENGINEER for review and New Paragraph 6.17.G has been added. See the <br /> approval of each such variation. Supplementary Conditions. <br /> E. ENGINEER 's Review 6 . 18 Continuing the Work <br /> 1 . ENGINEER will timely review and A. CONTRACTOR shall cavy on the Work and <br /> approve Shop Drawings and Samples in accordance adhere to the progress schedule during all disputes or <br /> with the schedule of Shop Drawings and Sample disagreements with OWNER. No Work shall be delayed or <br /> submittals acceptable to ENGINEER, postponed pending resolution of any disputes or <br /> ENGINEER' s review and approval will be only to disagreements, except as permitted by paragraph 15 .04 or as <br /> determine if the items covered by the submittals will, OWNER and CONTRACTOR may otherwise agree in <br /> after installation or incorporation in the Work, con- writing, <br /> form to the information given in the Contract Docu- <br /> ments and be compatible with the design concept of 6. 19 CONTRACTOR 's General Warranty and <br /> the completed Project as a functioning whole as Guarantee <br /> indicated by the Contract Documents. <br /> A. CONTRACTOR warrants and guarantees to <br /> OWNER, ENGINEER, and ENGINEER' s Consultants that <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.