My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> acceptance of such other work as fit and proper for <br /> integration with CONTRACTOR' s Work except for latent <br /> ARTICLE 7 - OTHER WORK defects and deficiencies in such other work. <br /> 7 .02 Coordination <br /> 7 .01 Related Work at Site <br /> A. If OWNER intends to contract with others for the <br /> A. OWNER may perform other work related to the performance of other work on the Project at the Site, the <br /> Project at the Site by OWNER's employees, or let other following will be set forth in Supplementary Conditions : <br /> direct contracts therefor, or have other work performed by <br /> utility owners. If such other work is not noted in the Con- 1 . the individual or entity who will have <br /> tract Documents, then: authority and responsibility for coordination of the <br /> activities among the various contractors will be <br /> 1 . written notice thereof will be given to identified; <br /> CONTRACTOR prior to starting any such other <br /> work; and 2. the specific matters to be covered by such <br /> authority and responsibility will be itemized; and <br /> 2 . if OWNER and CONTRACTOR are <br /> unable to agree on entitlement to or on the amount 3 , the extent of such authority and responsi- <br /> or extent, if any, of any adjustment in the Contract bilities will be provided. <br /> Price or Contract Times that should be allowed as a <br /> result of such other work, a Claim may be made B . Unless otherwise provided in the Supplementary <br /> therefor as provided in paragraph 10.05 . Conditions, OWNER shall have sole authority and respon- <br /> sibility for such coordination. <br /> B . CONTRACTOR shall afford each other contractor <br /> who is a party to such a direct contract and each utility <br /> owner (and OWNER, if OWNER is performing the other ARTICLE 8 - OWNER' S RESPONSIBILITIES <br /> work with OWNER' s employees) proper and safe access to <br /> the Site and a reasonable opportunity for the introduction <br /> and storage of materials and equipment and the execution of 8 .01 Communications to Contractor <br /> such other work and shall properly coordinate the Work <br /> with theirs. Unless otherwise provided in the Contract A. Except as otherwise provided in these General <br /> Documents, CONTRACTOR shall do all cutting, fitting, Conditions, OWNER shall issue all communications to <br /> and patching of the Work that may be required to properly CONTRACTOR through ENGINEER, <br /> connect or otherwise make its several parts come together <br /> and properly integrate with such other work. CON- 8 .02 Replacement of ENGINEER <br /> TRACTOR shall not endanger any work of others by <br /> cutting, excavating, or otherwise altering their work and will Part of paragraph 8.02.A has been deleted. <br /> only cut or alter their work with the written consent of A. In case of termination of the employment <br /> of <br /> ENGINEER and the others whose work will be affected. ENGINEER, OWNER shall appoint an engineer-to-whew <br /> The duties and responsibilities of CONTRACTOR under whose <br /> this paragraph are for the benefit of such utility owners and status under the Contract Documents shall be that of the <br /> other contractors to the extent that there are comparable former ENGINEER. <br /> provisions for the benefit of CONTRACTOR in said direct <br /> contracts between OWNER and such utility owners and 8 .03 Furnish Data <br /> other contractors. <br /> A. OWNER shall promptly furnish the data required <br /> C. If the proper execution or results of any part of of OWNER under the Contract Documents. <br /> CONTRACTOR' s Work depends upon work performed by <br /> others under this Article 7, CONTRACTOR shall inspect 8 . 04 Pay Promptly When Due <br /> such other work and promptly report to ENGINEER in <br /> writing any delays, defects, or deficiencies in such other A. OWNER shall make payments to CONTRACTOR <br /> work that render it unavailable or unsuitable for the proper promptly when they are due as provided in paragraphs <br /> execution and results of CONTRACTOR' s Work. 14.02 .0 and 14 .07.C. <br /> CONTRACTOR' s failure to so report will constitute an <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.