My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 . 05 Lands and Easements; Reports and Tests responsibility in respect thereof will be as set forth in the <br /> Supplementary Conditions. <br /> A. OWNER' s duties in respect of providing lands and <br /> easements and providing engineering surveys to establish <br /> reference points are set forth in paragraphs 4 .01 and 4 .05 . ARTICLE 9 - ENGINEER' S STATUS DURING <br /> Paragraph 4.02 refers to OWNER's identifying and making CONSTRUCTION <br /> available to CONTRACTOR copies of reports of explora- <br /> tions and tests of subsurface conditions and drawings of <br /> physical conditions in or relating to existing surface or 9 . 01 OWNER 'S Representative <br /> subsurface structures at or contiguous to the Site that have <br /> been utilized by ENGINEER in preparing the Contract A. ENGINEER will be OWNER' s representative <br /> Documents, during the construction period. The duties and responsi- <br /> bilities and the limitations of authority of ENGINEER as <br /> 8 . 06 Insurance OWNER' s representative during construction are set forth <br /> in the Contract Documents and will not be changed without <br /> A. OWNER' s responsibilities, if any, in respect to written consent of OWNER and ENGINEER. <br /> purchasing and maintaining liability and property insurance <br /> are set forth in Article 5 . 9 . 02 Visits to Site <br /> 8 .07 Change Orders A. ENGINEER will make visits to the Site at inter- <br /> vals appropriate to the various stages of construction as <br /> A. OWNER is obligated to execute Change Orders as ENGINEER deems necessary in order to observe as an <br /> indicated in paragraph 10.03 . experienced and qualified design professional the progress <br /> that has been made and the quality of the various aspects of <br /> 8 . 08 Inspections, Tests, and Approvals CONTRACTOR' s executed Work. Based on information <br /> obtained during such visits and observations, ENGINEER, <br /> A. OWNER' s responsibility in respect to certain for the benefit of OWNER, will determine, in general, if the <br /> inspections, tests, and approvals is set forth in paragraph Work is proceeding in accordance with the <br /> Contract <br /> 13 .03 .B . Documents. ENGINEER will not be required to make <br /> exhaustive or continuous inspections on the Site to check <br /> 8 .09 Limitations on OWNER 's Responsibilities the quality or quantity of the Work. ENGINEER' s efforts <br /> will be directed toward providing for OWNER a greater <br /> A. The OWNER shall not supervise, direct, or have degree of confidence that the completed Work will conform <br /> control or authority over, nor be responsible for, generally to the Contract Documents. On the basis of such <br /> CONTRACTOR' s means, methods, techniques, sequences, visits and observations, ENGINEER will keep OWNER <br /> or procedures of construction, or the safety precautions and informed of the progress of the Work and will endeavor to <br /> programs incident thereto, or for any failure of CON- guard OWNER against defective Work. <br /> TRACTOR to comply with Laws and Regulations applica- <br /> ble to the performance of the Work. OWNER will not be B . ENGINEER' s visits and observations are subject <br /> responsible for CONTRACTOR' s failure to perform the to all the limitations on ENGINEER' s authority and <br /> Work in accordance with the Contract Documents. responsibility set forth in paragraph 9 . 10, and particularly, <br /> but without limitation, during or as a result of ENGINEER's <br /> 8 . 10 Undisclosed Hazardous Environmental visits or observations of CONTRACTOR's Work <br /> Condition ENGINEER will not supervise, direct, control, or have <br /> authority over or be responsible for CONTRACTOR's <br /> A. OWNER' s responsibility in respect to an undis- means, methods, techniques, sequences, or procedures of <br /> closed Hazardous Environmental Condition is set forth in construction, or the safety precautions and programs <br /> paragraph 4.06. incident thereto, or for any failure of CONTRACTOR to <br /> comply with Laws and Regulations applicable to the <br /> 8 . 11 Evidence of Financial Arrangements performance of the Work. <br /> A. If and to the extent OWNER has agreed to furnish 9 . 03 Project Representative <br /> CONTRACTOR reasonable evidence that financial <br /> arrangements have been made to satisfy OWNER' s A. If OWNER and ENGINEER agree, ENGINEER <br /> obligations under the Contract Documents, OWNER' s will furnish a Resident Project Representative to assist <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.