Laserfiche WebLink
L <br /> ENGINEER in providing more extensive observation of the as provided in paragraph 13 .04, whether or not the Work is <br /> Work. The responsibilities and authority and limitations fabricated, installed, or completed. <br /> thereon of any such Resident Project Representative and <br /> assistants will be as provided in paragraph 9. 10 and in the 9 .07 Shop Drawings, Change Orders and Payments <br /> Supplementary Conditions. If OWNER designates another <br /> representative or agent to represent OWNER at the Site A. In connection with ENGINEER' s authority as to <br /> who is not ENGINEER' s Consultant, agent or employee, Shop Drawings and Samples, see paragraph 6. 17 . <br /> the responsibilities and authority and limitations thereon of <br /> such other individual or entity will be as provided in the B . In connection with ENGINEER' s authority as to <br /> Supplementary Conditions. Change Orders, see Articles 10, 11 , and 12 . <br /> 9 . 04 Clarifications and Interpretations C . In connection with ENGINEER' s authority as to <br /> Applications for Payment, see Article 14. <br /> A. ENGINEER will issue with reasonable promptness <br /> such written clarifications or interpretations of the require- 9 .08 Determinations for Unit Price Work <br /> meats of the Contract Documents as ENGINEER may <br /> determine necessary, which shall be consistent with the A. ENGINEER will determine the actual quantities <br /> intent of and reasonably inferable from the Contract Docu- and classifications of Unit Price Work performed by <br /> ments. Such written clarifications and interpretations will CONTRACTOR. ENGINEER will review with CON- <br /> be binding on OWNER and CONTRACTOR. If OWNER TRACTOR the ENGINEER' s preliminary determinations <br /> and CONTRACTOR are unable to agree on entitlement to on such matters before rendering a written decision thereon <br /> or on the amount or extent, if any, of any adjustment in the (by recommendation of an Application for Payment or <br /> Contract Price or Contract Times, or both, that should be otherwise). ENGINEER' s written decision thereon will be <br /> allowed as a result of a written clarification or interpre- final and binding (except as modified by ENGINEER <br /> to <br /> talion, a Claim may be made therefor as provided in reflect changed factual conditions or more accurate <br /> data) <br /> paragraph 10.05 . upon OWNER and CONTRACTOR, subject to the <br /> provisions of paragraph 10.05 . <br /> 9 .05 Authorized Variations in Work <br /> 9 .09 Decisions on Requirements of Contract <br /> A. ENGINEER may authorize minor variations in the Documents and Acceptability of Work <br /> Work from the requirements of the Contract Documents <br /> which do not involve an adjustment in the Contract Price or A. ENGINEER will be the initial interpreter of the <br /> the Contract Times and are compatible with the design requirements of the Contract Documents and judge of the <br /> concept of the completed Project as a functioning whole as acceptability of the Work thereunder. Claims, disputes and <br /> indicated by the Contract Documents. These may be other matters relating to the acceptability of the Work, <br /> the <br /> accomplished by a Field Order and will be binding on quantities and classifications of Unit Price <br /> Work, the <br /> OWNER and also on CONTRACTOR, who shall perform interpretation of the requirements of the Contract <br /> the Work involved promptly. If OWNER and CONTRAC- Documents pertaining to the performance of the Work, and <br /> TOR are unable to agree on entitlement to or on the amount Claims seeking changes in the Contract Price or Contract <br /> or extent, if any, of any adjustment in the Contract Price or Times will be referred initially to ENGINEER in writing, in <br /> Contract Times, or both, as a result of a Field Order, a accordance with the provisions of paragraph 10.05 , <br /> with a <br /> Claim may be made therefor as provided in paragraph request for a formal decision. <br /> 10.05 . <br /> Paragraph 9.09.B has been deleted in its entirety. <br /> 9 .06 Rejecting Defective Work ;i 4Vhen fimefiening as 4"Fetef and judge <br /> A. ENGINEER will have authority to disapprove or <br /> reject Work which ENGINEER believes to be defective, or OV94ER of GONT-RACTGR , wiU net be r. ab e in <br /> that ENGINEER believes will not produce a completed <br /> Project that conforms to the Contract Documents or that <br /> will prejudice the integrity of the design concept of the ENCANEER t + a vant t , this ...,,.., ,.�.,+ h 9. <br />09 +- ,th , ee <br /> , a <br /> completed Project as a functioning whole as indicated by <br /> the Contract Documents. ENGINEER will also have have been YA&ed by the ffiaking or- aeeeptanee of <br /> fiffl.al <br /> authority to require special inspection or testing of the Work <br /> pfeeedent by OV44ER or- CONTRACTOR <br /> Rev , 03 / 2006 Egret Marsh <br /> 00700 - 30 <br />