My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> ENGINEER in providing more extensive observation of the as provided in paragraph 13 .04, whether or not the Work is <br /> Work. The responsibilities and authority and limitations fabricated, installed, or completed. <br /> thereon of any such Resident Project Representative and <br /> assistants will be as provided in paragraph 9. 10 and in the 9 .07 Shop Drawings, Change Orders and Payments <br /> Supplementary Conditions. If OWNER designates another <br /> representative or agent to represent OWNER at the Site A. In connection with ENGINEER' s authority as to <br /> who is not ENGINEER' s Consultant, agent or employee, Shop Drawings and Samples, see paragraph 6. 17 . <br /> the responsibilities and authority and limitations thereon of <br /> such other individual or entity will be as provided in the B . In connection with ENGINEER' s authority as to <br /> Supplementary Conditions. Change Orders, see Articles 10, 11 , and 12 . <br /> 9 . 04 Clarifications and Interpretations C . In connection with ENGINEER' s authority as to <br /> Applications for Payment, see Article 14. <br /> A. ENGINEER will issue with reasonable promptness <br /> such written clarifications or interpretations of the require- 9 .08 Determinations for Unit Price Work <br /> meats of the Contract Documents as ENGINEER may <br /> determine necessary, which shall be consistent with the A. ENGINEER will determine the actual quantities <br /> intent of and reasonably inferable from the Contract Docu- and classifications of Unit Price Work performed by <br /> ments. Such written clarifications and interpretations will CONTRACTOR. ENGINEER will review with CON- <br /> be binding on OWNER and CONTRACTOR. If OWNER TRACTOR the ENGINEER' s preliminary determinations <br /> and CONTRACTOR are unable to agree on entitlement to on such matters before rendering a written decision thereon <br /> or on the amount or extent, if any, of any adjustment in the (by recommendation of an Application for Payment or <br /> Contract Price or Contract Times, or both, that should be otherwise). ENGINEER' s written decision thereon will be <br /> allowed as a result of a written clarification or interpre- final and binding (except as modified by ENGINEER <br /> to <br /> talion, a Claim may be made therefor as provided in reflect changed factual conditions or more accurate <br /> data) <br /> paragraph 10.05 . upon OWNER and CONTRACTOR, subject to the <br /> provisions of paragraph 10.05 . <br /> 9 .05 Authorized Variations in Work <br /> 9 .09 Decisions on Requirements of Contract <br /> A. ENGINEER may authorize minor variations in the Documents and Acceptability of Work <br /> Work from the requirements of the Contract Documents <br /> which do not involve an adjustment in the Contract Price or A. ENGINEER will be the initial interpreter of the <br /> the Contract Times and are compatible with the design requirements of the Contract Documents and judge of the <br /> concept of the completed Project as a functioning whole as acceptability of the Work thereunder. Claims, disputes and <br /> indicated by the Contract Documents. These may be other matters relating to the acceptability of the Work, <br /> the <br /> accomplished by a Field Order and will be binding on quantities and classifications of Unit Price <br /> Work, the <br /> OWNER and also on CONTRACTOR, who shall perform interpretation of the requirements of the Contract <br /> the Work involved promptly. If OWNER and CONTRAC- Documents pertaining to the performance of the Work, and <br /> TOR are unable to agree on entitlement to or on the amount Claims seeking changes in the Contract Price or Contract <br /> or extent, if any, of any adjustment in the Contract Price or Times will be referred initially to ENGINEER in writing, in <br /> Contract Times, or both, as a result of a Field Order, a accordance with the provisions of paragraph 10.05 , <br /> with a <br /> Claim may be made therefor as provided in paragraph request for a formal decision. <br /> 10.05 . <br /> Paragraph 9.09.B has been deleted in its entirety. <br /> 9 .06 Rejecting Defective Work ;i 4Vhen fimefiening as 4"Fetef and judge <br /> A. ENGINEER will have authority to disapprove or <br /> reject Work which ENGINEER believes to be defective, or OV94ER of GONT-RACTGR , wiU net be r. ab e in <br /> that ENGINEER believes will not produce a completed <br /> Project that conforms to the Contract Documents or that <br /> will prejudice the integrity of the design concept of the ENCANEER t + a vant t , this ...,,.., ,.�.,+ h 9. <br />09 +- ,th , ee <br /> , a <br /> completed Project as a functioning whole as indicated by <br /> the Contract Documents. ENGINEER will also have have been YA&ed by the ffiaking or- aeeeptanee of <br /> fiffl.al <br /> authority to require special inspection or testing of the Work <br /> pfeeedent by OV44ER or- CONTRACTOR <br /> Rev , 03 / 2006 Egret Marsh <br /> 00700 - 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.