My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR. Delays attributable to and within the <br /> d. ne fee clW! be payable an *fie basis a f control of a Subcontractor or Supplier shall be deemed to be <br /> eests kemize,, paef paragEaphs 11 .01 .A. 4 , delays within the control of CONTRACTOR. <br /> 12 .05 Delays Beyond OWNER 's and CONTRACTOR 's <br /> a. the afmiffint. of eff-edlit *8 be a4ewed by Control <br /> A. Where CONTRACTOR is prevented from <br /> ameunt of the ae4W not doer-ease in eest phis a. completing any part of the Work within the Contract Times <br /> deduefiee in GGINTn n CTO ' sfee by an (or Milestones) due to delay beyond the control of both <br /> ametuit eqtig to &e -pereent of such tet OWNER and CONTRACTOR, an extension of the <br /> deffeasez,-aad Contract Times (or Milestones) in an amount equal to the <br /> time lost due to such delay shall be CONTRACTOR's sole <br /> and exclusive remedy for such delay. <br /> 12 . 06 Delay Damages <br /> FaPhs , n , r 1 ., th fe gh. 12.01 .G.2. 0, ifie . Paragraphs 12.06.A and 12.06 B have been deleted and <br /> Siva; replaced with a new paragraph. See the Supplementary <br /> Conditions. <br /> 12 .02 Change of Contract Times A. I ., e e..t shaH OVAMR or- FRNQP4EER be <br /> , <br /> A. The Contract Times (or Milestones) may only be <br /> changed by a Change Order or by a Written Amendment. <br /> Any Claim for an adjustment in the Contract Times (or e€-er-restg-lfex- <br /> Milestones) shall be based on written notice submitted by <br /> the party making the claim to the ENGINEER and the other <br /> party to the Contract in accordance with the provisions of CONTRACTOR; <br /> paragraph 10.05 . <br /> 24 delaysbeyondthe—eentfel of both <br /> B . Any adjustment of the Contract Times (or OWNER and GQNq.:R. .A.GTA)R ineluding but no <br /> Milestones) covered by a Change Order or of any Claim for IkFAed to fires, fieeds, <br /> an adjustment in the Contract Times (or Milestones) will be <br /> determined in accordance with the provisions of this <br /> Article 12. as eentempla4ed by Arfiele 7 . <br /> 12 .03 Delays Beyond CONTRACTOR 's Control B . ,.t,.a,:., , i this " ..h, - 12 06 bats " eh ange ; . <br /> A. Where CONTRACTOR is prevented from , <br /> completing any part of the Work within the Contract Times <br /> (or Milestones) due to delay beyond the control of <br /> CONTRACTOR, the Contract Times (or Milestones) will <br /> be extended in an amount equal to the time lost due to such <br /> delay if a Claim is made therefor as provided in paragraph ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> 12.02.A. Delays beyond the control of CONTRACTOR CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> shall include, but not be limited to, acts or neglect by DEFECTIVE WORK <br /> OWNER, acts or neglect of utility owners or other <br /> contractors performing other work as contemplated by <br /> Article 7, fires, floods, epidemics, abnormal weather 13 .01 Notice of Defects <br /> conditions, or acts of God. <br /> A. Prompt notice of all defective Work of which <br /> 12 .04 Delays Within CONTRACTOR 's Control OWNER or ENGINEER has actual knowledge will be <br /> given to CONTRACTOR. All defective Work may be <br /> A. The Contract Times (or Milestones) will not be rejected, corrected, or accepted as provided in this <br /> extended due to delays within the control of Article 13 . <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.