Laserfiche WebLink
prior to CONTRACTOR' s purchase thereof for <br /> 13 .02 Access to Work incorporation in the Work. Such inspections, tests, or <br /> approvals shall be performed by organizations acceptable to <br /> A. OWNER, ENGINEER, ENGINEER' s Con- OWNER and ENGINEER, <br /> sultants, other representatives and personnel of OWNER, <br /> independent testing laboratories, and governmental agencies E . If any Work (or the work of others) that is to be <br /> with jurisdictional interests will have access to the Site and inspected, tested, or approved is covered by CONTRAC- <br /> the Work at reasonable times for their observation, TOR without written concurrence of ENGINEER, it must, <br /> inspecting, and testing. CONTRACTOR shall provide if requested by ENGINEER, be uncovered for observation. <br /> them proper and safe conditions for such access and advise <br /> them of CONTRACTOR' s Site safety procedures and F. Uncovering Work as provided in paragraph <br /> programs so that they may comply therewith as applicable . 13 .03 .E shall be at CONTRACTOR' s expense unless CON- <br /> TRACTOR has given ENGINEER timely notice of <br /> 13 . 03 Tests and Inspections CONTRACTOR' s intention to cover the same and ENGI- <br /> NEER has not acted with reasonable promptness in <br /> A. CONTRACTOR shall give ENGINEER timely response to such notice . <br /> notice of readiness of the Work for all required inspections, <br /> tests, or approvals and shall cooperate with inspection and 13 . 04 Uncovering Work <br /> testing personnel to facilitate required inspections or tests. <br /> A. If any Work is covered contrary to the written <br /> Paragraph 13.03.B has been deleted and replaced with a request of ENGINEER, it must, if requested by ENGI- <br /> new paragraph. See the Supplementary Conditions. NEER, be uncovered for ENGINEER' s observation and <br /> B . replaced at CONTRACTOR' s expense. <br /> teststests or- ap al a _ea by the Gent. aet ,-.,.. unie .. Parts of the last two sentences of paragraph <br /> 13.04.8 <br /> , Vl (f w <br /> exsegtt have been deleted. <br /> B . If ENGINEER considers it necessary or advisable <br /> 1 . €ef inspeetiens, tests, or- a"fevals that covered Work be observed by ENGINEER or inspect- <br /> eever-ed by pafagmphs 13 .03 .G and 13 .03 .D ed or tested by others, CONTRACTOR, at ENGINEER 's <br /> request, shall uncover, expose, or otherwise make available <br /> 2 that eosts 4waffed in eameetien - 4`'- for observation, inspection, or testing as ENGINEER may <br /> require, that portion of the Work in question, famishing all <br /> 13 .04 .B shall be paid as pFwAded in said pmagr-ap necessary labor, material, and equipment. If it is found that <br /> 3 .^r� 04a; such Work is defective, CONTRACTOR shall pay all <br /> Claims, costs, losses, and damages (including but not <br /> limited to all fees and charges of engineers, architects, <br /> attorneys, and other professionals and all court or arbitration <br /> or other dispute resolution costs) arising out of or relating to <br /> such uncovering, exposure, observation, inspection, and <br /> Paragraph 13.03.0 has been deleted in its entirety. testing, and of satisfactory replacement or reconstruction <br /> (including but not limited to all costs of repair or <br /> replacement of work of others); and OWNER shall be <br /> entitled to an appropriate decrease in the Contract Price. If <br /> the parties are unable to agree as to the amount thereof, <br /> OWNER may make a Claim therefor as provided in <br /> paragraph 10.05 . If, however, such Work is not found to be <br /> defective, CONTRACTOR shall be allowed <br /> an extension of the Contract Times (or <br /> Milestones), erbed3; directly attributable to such <br /> D. CONTRACTOR shall be responsible for uncovering, exposure, observation, inspection, testing, <br /> arranging and obtaining and shall pay all costs in connection replacement, and reconstruction. If the parties are unable to <br /> with any inspections, tests, or approvals required for agree as to the-amount-er extent thereof, CONTRACTOR <br /> OWNER' s and ENGINEER' s acceptance of materials or may make a Claim therefor as provided in paragraph 10 .05 . <br /> equipment to be incorporated in the Work; or acceptance of <br /> materials, mix designs, or equipment submitted for approval <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 37 <br />