My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 . 02 .D) beeeme due, and m4iea due vAll be paid b Parts of 14.04.A. have been deleted and replaced. See <br /> CONTRACTOR.OWNER to Supplementary Conditions. <br /> D. Reduction in Payment 14 .04 Substantial Completion <br /> 1 . OWNER may refuse to make payment of A. When CONTRACTOR considers the entire Work <br /> the full amount recommended by ENGINEER ready for its intended use CONTRACTOR shall notify <br /> because: OWNER and ENGINEER in writing that the entire Work is <br /> substantially complete (except for items specifically listed <br /> a. claims have been made against OWNER by CONTRACTOR as incomplete) and request that <br /> on account of CONTRACTOR' s performance or ENGINEER issue a certificate of Substantial Completion. <br /> furnishing of the Work; Promptly thereafter, OWNER, CONTRACTOR, and <br /> ENGINEER shall make an inspection of the Work to <br /> Part of Paragraph 14.02.D.1 .b. has been deleted. determine the status of completion. If ENGINEER does not <br /> b. Liens have been filed in connection with consider the Work substantially complete, ENGINEER will <br /> the Work, e.:,eptw here GONTRAGTOR h notify CONTRACTOR in writing giving the reasons <br /> delivered a spervifie Bead safisfaeter-y to OWN therefor. If ENGINEER considers the Work substantially <br /> complete, ENGINEER will prepare and deliver to OWNER <br /> sueh Liens; a tentative certificate of Substantial Completion which shall <br /> fix the date of Substantial Completion. There sha14 be <br /> c. there are other items entitling OWNER to yed. to the eeF"ea4etentative list of iterns t 4 <br /> a set-off against the amount recommended; or <br /> d. OWNER has actual knowledge of the <br /> occurrence of any of the events enumerated in <br /> paragraphs 14.02 .B . 5 .a through 14 .02 .B .5 .c or eensidefing sueh objeetions, <br /> paragraph 15 .02 .A. Work is not substaH6aRy eemplete, <br /> New paragraphs 14.02.D.1 .e, f, g, and h have been <br /> added. See the Supplementary Conditions. reasens thArefen if, a tar—fie f ^`x '* E ' s <br /> 2 . If OWNER refuses to make payment of <br /> the full amount recommended by ENGINEER, deliver- to 9WAMR and GG@ r r o A /"' OR a defiBitive <br /> OWNER must give CONTRACTOR immediate <br /> written notice (with a copy to ENGINEER) stating <br /> the reasons for such action and promptly pay CON- r c �^ n. .^w ^w^-• ^ ^-- the enta :. ,, m6 fieate <br /> lE, VMVll V114L.1E. n <br /> TRACTOR any amount remaining after deduction ENGWEER believes justified a4er- eensideFafien of any <br /> of the amount so withheld. OWNER shall promptly objeetions fFem OWNER, At the time of delivery of the <br /> pay CONTRACTOR the amount so withheld, or any tentative certificate of Substantial Completion ENGINEER <br /> adjustment thereto agreed to by OWNER and will deliver to OWNER and CONTRACTOR a written <br /> CONTRACTOR, when CONTRACTOR corrects to recommendation as to division of responsibilities pending <br /> OWNER' s satisfaction the reasons for such action. final payment between OWNER and CONTRACTOR with <br /> respect to security, operation, safety, and protection of the <br /> 3 . If it is subsequently determined that Work, maintenance, heat, utilities, insurance, and warranties <br /> OWNER' s refusal of payment was not justified, the and guarantees. Unless OWNER and CONTRACTOR <br /> amount wrongfully withheld shall be treated as an agree otherwise in writing and so inform ENGINEER in <br /> amount due as determined by paragraph 14. 02.C. 11 writing prior to ENGINEER' s issuing the definitive <br /> certificate of Substantial Completion, ENGINEER' s <br /> 14. 03 CONTRACTOR 's Warranty of Title aforesaid recommendation will be binding on OWNER and <br /> CONTRACTOR until final payment. <br /> A. CONTRACTOR warrants and guarantees that title <br /> to all Work, materials, and equipment covered by any B . OWNER shall have the right to exclude <br /> Application for Payment, whether incorporated in the CONTRACTOR from the Site after the date of Substantial <br /> Project or not, will pass to OWNER no later than the time Completion, but OWNER shall allow CONTRACTOR <br /> of payment free and clear of all Liens. <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.