My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
beth directly attributable to such uncovering , exposure , observation , inspection , testing , <br /> replacement, and reconstruction . If the parties are unable to agree as to the meaet9 <br /> extent thereof, CONTRACTOR may make a Claim therefor as provided in paragraph <br /> 10 . 05 . <br /> SC -13 . 05 OWNER May Stop the Work <br /> SC- 13 . 05 .A. Delete paragraph GC- 13. 05.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment, or fails to comply with permit <br /> requirements , or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents , OWNER may order CONTRACTOR to stop the Work , or any <br /> portion thereof, until the cause for such order has been eliminated ; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part of <br /> OWNER to exercise this right for the benefit of CONTRACTOR, any <br /> Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br /> employee or agent of any of them . <br /> SC -14. 02 Progress Payments <br /> SC- 14 . 02 . 13 . 5 . Add the following paragraphs at the end of paragraph GC- 14. 02. 8. 5: <br /> e . OWNER has been required to pay ENGINEER or ENGINEER's Consultant <br /> additional compensation because of CONTRACTOR delays or rejection of <br /> defective Work ; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections , tests , or approvals taken after initial failing inspections , <br /> tests , or approvals . <br /> SC- 14 . 02 . C . 1 . Delete paragraph GC- 14. 02. C. 1 in its entirety and insert the following <br /> paragraph in its place: <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the " Local <br /> Government Prompt Payment Act ' Florida Statutes section 218 . 70 , et. seq . <br /> SCA 4402 , Do1 . b Revise GC- 14. 02. D. 1 , b to read as follows: <br /> b . Liens have been filed in connection with the Work . <br /> SC- 14 . 02 . D . 1 Add the following paragraphs at the end of paragraph GC- 14. 02. D. 1 . d: <br /> e . CONTRACTOR fails to make payment to Subcontractors for materials or labor in <br /> accordance with the respective agreements between the CONTRACTOR and the <br /> Subcontractors ; <br /> f. the Work for which payment is requested cannot be verified ; <br /> g1 of persistent failure to carry out the Work in accordance with the Contract <br /> Documents , or otherwise unsatisfactory prosecution of the Work ; or <br /> Last Revised 12/2007 00800- 12- Wabasso Beach Pk . Restoration <br /> F:\Public Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9-2008\Div 0 AS OF 1 -8- <br /> 2008\00800 - Supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.