My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> h , of any other breach of, default under or violation of, or failure to comply with , the <br /> provisions of the Contract Documents . <br /> SC -14. 04 Substantial Completion <br /> SC- 14 .4 , A. Delete the 5th, 6th, 70, and 8t' sentences in that paragraph and replace them with <br /> the following: <br /> In accordance with the provisions of Florida Statues section 208 . 735(7 ) (x )(2005 ) , <br /> upon receipt of the tentative certificate of substantial completion from <br /> ENGINEER , the OWNER , ENGINEER, and the CONTRACTOR shall conduct a <br /> walk-through inspection of the Project to document a list of any items required to <br /> render the Work on the Project complete , satisfactory , and acceptable under this <br /> Agreement ( herein the "Statutory List") . The Statutory List shall be reduced to <br /> writing and circulated among the OWNER, the ENGINEER , and the <br /> CONTRACTOR by the OWNER or the ENGINEER within 30 calendar days after <br /> substantial completion . The OWNER or the ENGINEER acknowledge and agree <br /> that: 1 ) the failure to include any corrective work, or pending items that are not <br /> yet completed , on the Statutory List does not alter the responsibility of the <br /> CONTRACTOR to complete all the Work under this Agreement; 2) upon <br /> completion of all items on the Statutory List, the CONTRACTOR may submit a <br /> pay request for all remaining retainage except as otherwise set forth in this <br /> Agreement; and 3) any and all items that require correction under this Agreement <br /> and that are identified after the preparation of the Statutory List remain the <br /> obligation of the CONTRACTOR to complete to the OWNER' S satisfaction under <br /> this Agreement. After receipt of the Statutory List by the CONTRACTOR , the <br /> CONTRACTOR acknowledges and agrees that it will diligently proceed to <br /> complete all items on the Statutory List and schedule a final walk-through in <br /> anticipation of final completion of the Project. <br /> SC-14. 07 Final Payment <br /> SC- 14 . 07 . C . 1 . Delete paragraph GC44. 07. C. 1 in its entirety and insert the following paragraph <br /> in its place: <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the " Local <br /> Government Prompt Payment Act" Florida Statutes section 218 . 70 , et. seq . <br /> SC-14. 09 Waiver of Claims <br /> SC- 14 . 09 Delete paragraph GC44. 09. A in its entirety and insert the following paragraph in <br /> its place: <br /> A. Acceptance of Final Payment as Release . The acceptance by the <br /> CONTRACTOR of final payment shall be and shall operate as a release to the <br /> OWNER from all claims and all liability to the CONTRACTOR other than claims <br /> in stated amounts as may be specifically excepted by the CONTRACTOR for all <br /> things done or furnished in connection with this Work and for every act and <br /> neglect of the OWNER and others relating to or arising out of this Work . Any <br /> payment , however, final or otherwise , shall not release the CONTRACTOR or his <br /> Last Revised 12/2007 00800- 13m Wabasso Beach Pk . Restoration <br /> F:\Public Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9-2008\Div 0 AS OF 1 -8- <br /> 2008\00800 - Supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.