My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 . SHEET ASO . 10 SHOWS DIRECTIOHNAL ARROWS AND A CROSSWALK IN THE PARKING <br /> LOT ; THEY ARE NOT SHOWN ON SHEET C-2 ; ARE THEY FOR REFERENCE OR PART OF <br /> THE PARKING LOT SRIPPING ? <br /> Directional arrows and crosswalk striping are not to be construction. All proposed parking lot <br /> striping is shown on Sheet C-2. <br /> Item 4 — REVISION TO SECTION 00310 — BID FORM : In SECTION 00310 — Bid Form , page <br /> 00310- 1 , Article 2 . 01 , REVISE the second sentence to read as follows : <br /> "The Bid will remain subject to acceptance for 90 days after the Bid opening, or for such <br /> longer period. . . . . . . . . . . " <br /> Item 5 — THE FOLLOWING DRAWINGS ARE ATTACHED AND REPLACE THE <br /> CORRESPONDING DRAWING AS MAY BE NOTED : <br /> REVISED DRAWING REPLACED DRAWING <br /> LA - 1 REVISED LA - 1 <br /> U - 1 REVISED U - 1 <br /> U - 2 REVISED U - 2 <br /> U - 4 REVISED U - 4 <br /> U - 6 REVISED U - 6 <br /> U - 7REVISED U - 7 <br /> U - 8REVISED U - 8 <br /> U - 8A REVISED N/A <br /> C1 REVISED C1 <br /> C2 REVISED C2 <br /> C3 REVISED C3 <br /> C4 REVISED C4 <br /> C5 REVISED C5 <br /> C6 REVISED C6 <br /> C7 REVISED C7 <br /> C8 REVISED C8 <br /> Item 6 — IN THE CONTRACT DOCUMENTS , DIVISION 1 , SECTION 01009 SPECIAL <br /> PROVISIONS , PAGE 01009- 3 , ADD THE FOLLOWING ARTICLE 1 . 3 , ENVIRONMENT <br /> PROTECTION : <br /> 1 . 3 Environmental Protection <br /> environmental pollution and damage as the result of <br /> A - Scope: This section covers prevention of p 9 <br /> construction operations under this contract and for those measures set forth in other provisions of these <br /> Technical Provisions. For the purpose of this specification, environmental pollution and damage are <br /> defined as the presence of chemical, physical or biological elements or agents which adversely affect <br /> human health or welfare; unfavorably alter ecological balances of importance to human life; affect other <br /> species of importance to man; or degrade the utility of the environment for aesthetic, cultural and/or <br /> historical purposes. The control of environmental pollution and damage requires consideration of air, water <br /> and land and includes management of visual esthetics, noise, solid waste, radiant energy and radioactive <br /> materials, as well as other pollutants. <br /> B - Quality Control: The CONTRACTOR shall establish and maintain quality control for environmental <br /> protection of all items set forth herein. The CONTRACTOR shall record any problems in complying with <br /> laws, regulations and ordinances, and corrective action taken . <br /> in writing of an noncompliance with Federal, <br /> C - Notification: The OWNER will notify the CONTRACTORg y p <br /> State or Local laws or regulations, permits and other elements - as may be observed by the OWNER. The <br /> CONTRACTOR shall, after receipt of such notice, inform the OWNER of proposed corrective action and take <br /> F :\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 2-6-20081Hddendum #1 #2 , #3 , #4 , & <br /> #5\ADDENDUM #2 AND ATTACHMENTS\Addendum #2 .doc Page 9 of 11 <br /> Rev . 3- 12-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.