areas is restricted during the sea turtle nesting season from March 1 through <br /> October 31 . As may be necessary the OWNER may suspend WORK in the area <br /> seaward of the coastal primary dune line during this period as may be required by <br /> the Florida department of environmental Protection ( FDEP ) permit. Suspension of <br /> work described above shall not form a basis for claims by the CONTRACTOR for <br /> time extensions or incurred costs . <br /> ,. B . Permits and Licenses : Indian River County will obtain the necessary FDEP permit . <br /> Any other permits and licenses required for the work shall be secured and paid for <br /> by the CONTRACTOR . Copies of all certifications , licenses , and permits obtained <br /> ,. by the CONTRACTOR shall be provided to the OWNER prior to commencement of <br /> the WORK . <br /> The CONTRACTOR will be provided a copy of the FDEP permit . By submission of <br /> his bid , the CONTRACTOR warrants that he shall comply with the permit conditions <br /> as they apply to the CONTRACTOR' S WORK specified herein . Any questions <br /> regarding permit conditions will be addressed at the Pre-construction meeting . <br /> The CONTRACTOR shall abide by all notes and conditions on the plans and <br /> specifications and all applicable permits ; specifically those involving beach tilling , <br /> prohibition of discharge of oil and debris , placement of non-suitable beach fill , etc . <br /> and as may be specified elsewhere herein . If the CONTRACTOR violates any <br /> condition of the permit resulting in the stopping of WORK by the State of Florida or <br /> other public entity , then any additional costs incurred by the CONTRACTOR shall be <br /> paid by the CONTRACTOR and not charged to the OWNER . <br /> The CONTRACTOR shall post copies of all permits at the job sites in a manner <br /> clearly visible . <br /> C . Turtle Nesting Season : As specified above this Project must be constructed outside <br /> of sea turtle nesting season except as otherwise provided for in the FDEP permit <br /> authorizing the work. The CONTRACTOR shall comply with all State and Federal <br /> permit restrictions regarding construction activity within the project boundaries . All <br /> equipment shall be removed from the project site on or before the date specified by the <br /> OWNER at the Pre-Construction Meeting to allow for turtle nesting . The CONTRACTOR <br /> should plan to cease work at the start of the turtle nesting season unless otherwise <br /> specifically authorized in writing by the OWNER and FDEP to continue construction . In <br /> the event WORK is allowed to proceed into the early part of sea turtle nesting season <br /> (March 1 to March 31 ) CONTRACTOR will be required to wait for clearance from sea <br /> turtle nesting surveyors before starting work each morning and will be required to <br /> avoid any marked sea turtle nests . <br /> + + END OF SECTION + + <br /> Last Revised 1 /2008 01009-3 Wabasso Beach Pk . Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01009 - special Provisions .doc <br />