and ENGINEER' s CONSULTANT shall determine which specification or <br /> requirement governs , and the ENGINEER' s and ENGINEER' s CONSULTANT ' s <br /> decision shall be final . <br /> E . Other Specifications and Requirements : In some instances the Specifications <br /> contained herein may refer to other requirements or specifications (such as <br /> FDOT' s Standard Specifications for Road and Bridge Construction ) . If there is a <br /> conflict between the Specifications and any referenced specification or <br /> requirement , then the most stringent specification or requirement shall govern . <br /> In any event , the ENGINEER and ENGINEER ' s CONSULTANT shall determine <br /> which specification or requirement governs , and the ENGINEER ' s and <br /> ENGINEER ' s CONSULTANT ' s decisions shall be final . <br /> F . Notify all permitting agencies of intention to begin construction . Give proper <br /> notification within the time frame required by the agency. <br /> G . Give the ENGINEER ten ( 10 ) days minimum notice before beginning work on the <br /> Project . <br /> H . Give the ENGINEER a minimum of 48 hours notice before performing any test . <br /> I . Do not work overtime unless authorized to do so by OWNER . If overtime is <br /> required , provide 48 hours minimum notice to the ENGINEER . <br /> J . Do not perform any work on holidays or weekends that require construction <br /> observation by the ENGINEER and ENGINEER' s CONSULTANT or OWNER , <br /> without first obtaining the OWNER ' s written permission . <br /> K . Anything mentioned in the Specifications and not shown in the Drawings , or <br /> shown in the Drawings and not mentioned in the Specifications , shall be of like <br /> effect as if shown or mentioned in both . <br /> L . Maintain existing drainage during construction . <br /> N . Before performing any work outside the designated limits of the work site , secure <br /> all necessary permits and authorization from the applicable owner, or verify in <br /> writing that such has been previously obtained . Follow all requirements of any <br /> permits or authorization . Give the ENGINEER and appropriate owner ten ( 10 ) <br /> days minimum notice before commencing construction operations outside the <br /> designated limits of the work site . <br /> 1 . 2 CONSTRUCTION SEAWARD OF THE COASTAL PRIMARY DUNE LINE <br /> A . Restrictions : CONTRACTOR is advised a portion of the WORK is seaward of the <br /> coastal primary dune line , including the ramp and stair crosswalks . Work in these <br /> Last Revised 1 /2008 01009-2 Wabasso Beach Pk . Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01009 - Special Provisions.doc <br />