Laserfiche WebLink
SECTION 01009 <br />SPECIAL PROVISIONS <br />1.1 GENERAL <br />A. Visits to the construction site may be made by representatives of permitting or <br />governing bodies. Submit details of all instructions from the above to the <br />ENGINEER immediately. The OWNER will not accept the Work until final <br />acceptance has been received from the various Regulatory Agencies having <br />jurisdiction. <br />B. Furnish sufficient labor, construction equipment and materials, and work such <br />hours, including night shifts and overtime operations, as may be necessary to <br />insure the prosecution of the work in accordance with the approved progress <br />schedule. If in the opinion of the ENGINEER and ENGINEER's CONSULTANT, <br />the CONTRACTOR falls behind the progress schedule, take such steps as may <br />be necessary to improve progress, all without additional cost to the OWNER. <br />The ENGINEER and ENGINEER's CONSULTANT shall be compensated for <br />his overtime services in accordance with the Supplementary Conditions. <br />Failure to comply with the requirements of the ENGINEER and ENGINEER's <br />CONSULTANT under this provision shall be grounds for determination by the <br />ENGINEER and ENGINEER's CONSULTANT that the CONTRACTOR is not <br />prosecuting the work with such diligence as will insure completion within the time <br />specified. Upon such determination, the ENGINEER and ENGINEER's <br />CONSULTANT may recommend to the OWNER to seek such legal remedy as is <br />deemed necessary to protect the OWNER's interest. <br />Co All salvageable material and equipment for which specific use, relocation, or <br />other disposal is not specifically noted shall remain the property of the OWNER <br />and shall be delivered at the CONTRACTOR's expense to the OWNER at the <br />Indian River County Road and Bridge Facility at 4550 41st Street, Vero Beach, at <br />the CONTRACTOR's expense. All material and equipment not in salvageable <br />condition, as determined by the ENGINEER and ENGINEER's CONSULTANT <br />shall be disposed of by the CONTRACTOR, at the CONTRACTOR's expense. <br />All excess excavated soils shall remain the property of the OWNER and shall be <br />disposed of as directed by the ENGINEER and approved by the OWNER. <br />D. Requirements of Permits or Grants: In addition to these Specifications, all Work <br />shall comply with the requirements of local permitting agencies, St. Johns River <br />Water Management District, the U.S. Army Corps of Engineers, and all other <br />state or federal agencies' permit or grant requirements. If there is a conflict <br />between the Specifications and any permit or grant requirement, then the most <br />stringent specification or requirement shall govern. In any event, the ENGINEER <br />Last Revised 12/2007 01009-1 Wabasso Beach Pk, Restoration <br />FAPublic Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div 1\01009 - Special Provisions.doc <br />