Payment Bond as required by these Contract Documents, <br />2, Payment: The total lump sum to be paid for this item shall not exceed one <br />and one- half (1.5) percent of the total bid. Twenty-five (25) percent of the bid <br />item amount may be paid in the first application for payment and the remaining <br />seventy-five (75) percent of the bid item amount shall be paid in the last <br />application for payment. <br />D. Item 1.04 - Insurance Coverage: <br />1. Measurement: The lump sum payment will be full compensation for providing <br />ALL the specified insurance coverage required by the Contract Documents. <br />2. Payment: Fifty (50) percent of the bid item amount will be paid in the first <br />application for payment, and the remaining fifty (50) percent of the bid item <br />amount shall be paid for Insurance Coverage will be made when the project is <br />complete and accepted by the OWNER <br />E. Item 1.06 - Record Drawings and Survey Work: <br />1. Measurement and Payment: The lump sum payment will be full compensation, <br />including but not limited to, all labor, materials, and equipment required to <br />prepare project record drawings including AutoCAD work and establish and <br />protect survey control points, replace disturbed or destroyed property <br />monuments and survey control points, and perform construction staking. <br />2. Payment: Twenty-five (25) percent of the bid item amount may be paid in the <br />first application for payment, twenty-five (25) percent may be paid at <br />approximately the one-half way point in the construction contract, and the <br />remaining fifty (50) percent of the bid item amount shall be paid in the last <br />application for payment. <br />G. Item 2.01 and 2.07 — This item is listed and generally described in Section 00310 <br />Bid Form <br />1. Measurement: The lump sum payment will be full compensation for constructing <br />all items in accordance with the Contract Documents and regulatory <br />requirements, including but not limited to, all labor, materials, equipment, <br />permits, cleanup, disposal of debris, transportation and maintenance during the <br />term of the Project and startup. <br />2. Payment: Payment will be based on percent of bid item completed. (i.e. 10 <br />percent of lump sum amount (less retainage) will be paid at 10 percent of <br />earned bid item.) <br />H. Items 2.02, 2.03, 2.04, 2.05, and 2.06 — These items are listed and generally <br />described in Section 00310 Bid Form. <br />1. Measurement: The quantity of the item will be the measured amount of the <br />Last Revised 12/2007 01025-3 Wabasso Beach Pk Restoration <br />FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div 1 \01 025 - Measurement and Payment.doc <br />