My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Payment Bond as required by these Contract Documents , <br /> 2 , Payment : The total lump sum to be paid for this item shall not exceed one <br /> and one - half ( 1 . 5) percent of the total bid . Twenty-five (25 ) percent of the bid <br /> item amount may be paid in the first application for payment and the remaining <br /> seventy-five (75 ) percent of the bid item amount shall be paid in the last <br /> application for payment . <br /> D . Item 1 . 04 - Insurance Coverage : <br /> 1 . Measurement: The lump sum payment will be full compensation for providing <br /> ALL the specified insurance coverage required by the Contract Documents , <br /> 2 . Payment : Fifty ( 50 ) percent of the bid item amount will be paid in the first <br /> application for payment , and the remaining fifty ( 50 ) percent of the bid item <br /> amount shall be paid for Insurance Coverage will be made when the project is <br /> complete and accepted by the OWNER <br /> E . Item 1 . 06 - Record Drawings and Survey Work : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation , <br /> including but not limited to , all labor, materials , and equipment required to <br /> prepare project record drawings including AutoCAD work and establish and <br /> protect survey control points , replace disturbed or destroyed property <br /> monuments and survey control points , and perform construction staking . <br /> 2 . Payment : Twenty-five (25 ) percent of the bid item amount may be paid in the <br /> first application for payment , twenty-five (25 ) percent may be paid at <br /> approximately the one- half way point in the construction contract , and the <br /> remaining fifty ( 50 ) percent of the bid item amount shall be paid in the last <br /> application for payment . <br /> 2 . 0 CONSTRUCTION ITEMS and 3 . 0 UNIT PRICE ITEMS <br /> G . Item 2 . 01 and 2 . 07 — This item is listed and generally described in Section 00310 <br /> Bid Form <br /> 1 . Measurement : The lump sum payment will be full compensation for constructing <br /> all items in accordance with the Contract Documents and regulatory <br /> requirements , including but not limited to , all labor, materials , equipment , <br /> permits , cleanup , disposal of debris , transportation and maintenance during the <br /> term of the Project and startup . <br /> 2 . Payment : Payment will be based on percent of bid item completed . ( i . e . 10 <br /> percent of lump sum amount ( less retainage ) will be paid at 10 percent of <br /> earned bid item . ) <br /> H . Items 2 . 02 , 2 . 03 , 2 . 04 , 2 . 05 , and 2 . 06 — These items are listed and generally <br /> described in Section 00310 Bid Form . <br /> 1 . Measurement : The quantity of the item will be the measured amount of the <br /> Last Revised 12/2007 01025-3 Wabasso Beach Pk Restoration <br /> F :\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01 025 - Measurement and Payment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.