My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01040 <br /> PROJECT COORDINATION <br /> 1 . 1 SCOPE <br /> A . CONTRACTOR shall be solely responsible for coordination ( including <br /> scheduling ) of all of work to insure completion of the Work within the Contract <br /> Time . Supervise , direct, and fully cooperate with all subcontractors , <br /> manufacturers , fabricators , suppliers , distributors , installers , testing agencies , <br /> and all others whose services , materials , or equipment are required , including <br /> the work of any other contractor, utility service company , or OWNER' S <br /> employees performing additional work related to the Project . <br /> Be Maintain sufficient competent personnel , drafting equipment , and supplies at the <br /> site for the purpose of preparing layout and coordination drawings . These <br /> drawings shall supplement the Contract Documents , working drawings , and <br /> Shop Drawings as necessary , to correlate the work of various trades . Where <br /> such drawings are to be prepared by subcontractors , ensure that each <br /> subcontractor maintains the required personnel and facilities at the site . <br /> Co Attend and participate in all project meetings and report on the progress of all <br /> work and compliance with schedules . <br /> 1 . 2 MISCELLANEOUS COORDINATION <br /> A . Prepare and discuss an emergency preparation and restoration plan to address <br /> eventualities such as tropical storms and hurricanes . <br /> Be Provide all parties with an emergency 24- hour telephone number. <br /> C . Notify local law enforcement agencies before closing one or more lanes of traffic <br /> for periods exceeding one hour. <br /> D . Safely conduct the public through the permitted work area from the time work <br /> begins to the time of final completion . Fully comply with these Specifications , <br /> Indian River County Traffic Division Standards , and FDOT' s Roadway and Traffic <br /> Design Standards (600 Series ) ; in the event of a conflict , the more stringent <br /> specification or requirement shall govern . <br /> + + END OF SECTION + + <br /> Last Revised 12/2007 01040- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01040 - Project Coordination .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.