Laserfiche WebLink
SECTION 01040 <br /> PROJECT COORDINATION <br /> 1 . 1 SCOPE <br /> A . CONTRACTOR shall be solely responsible for coordination ( including <br /> scheduling ) of all of work to insure completion of the Work within the Contract <br /> Time . Supervise , direct, and fully cooperate with all subcontractors , <br /> manufacturers , fabricators , suppliers , distributors , installers , testing agencies , <br /> and all others whose services , materials , or equipment are required , including <br /> the work of any other contractor, utility service company , or OWNER' S <br /> employees performing additional work related to the Project . <br /> Be Maintain sufficient competent personnel , drafting equipment , and supplies at the <br /> site for the purpose of preparing layout and coordination drawings . These <br /> drawings shall supplement the Contract Documents , working drawings , and <br /> Shop Drawings as necessary , to correlate the work of various trades . Where <br /> such drawings are to be prepared by subcontractors , ensure that each <br /> subcontractor maintains the required personnel and facilities at the site . <br /> Co Attend and participate in all project meetings and report on the progress of all <br /> work and compliance with schedules . <br /> 1 . 2 MISCELLANEOUS COORDINATION <br /> A . Prepare and discuss an emergency preparation and restoration plan to address <br /> eventualities such as tropical storms and hurricanes . <br /> Be Provide all parties with an emergency 24- hour telephone number. <br /> C . Notify local law enforcement agencies before closing one or more lanes of traffic <br /> for periods exceeding one hour. <br /> D . Safely conduct the public through the permitted work area from the time work <br /> begins to the time of final completion . Fully comply with these Specifications , <br /> Indian River County Traffic Division Standards , and FDOT' s Roadway and Traffic <br /> Design Standards (600 Series ) ; in the event of a conflict , the more stringent <br /> specification or requirement shall govern . <br /> + + END OF SECTION + + <br /> Last Revised 12/2007 01040- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01040 - Project Coordination .doc <br />