Laserfiche WebLink
SECTION 01050 <br />SURVEYING AND FIELD ENGINEERING SERVICES <br />1.1 GENERAL <br />A. Provide civil, structural, survey, or other professional engineering services <br />specified or required, to execute the CONTRACTOR's construction methods <br />Be Develop and make all detail surveys and measurements needed for construction <br />including but not limited to, slope stakes, batter boards, piling layouts, and all <br />other working lines, elevations, and cut sheets. <br />C. Keep a transit and leveling instrument on the site at all times and a skilled <br />instrument man available whenever necessary for layout of the Work. <br />D. Provide all material required for benchmarks, control points, batter boards, grade <br />stakes, and other items. <br />E. Be solely responsible for all locations, dimensions, and levels. No data other <br />than written orders from the ENGINEER's CONSULTANT shall justify departure <br />from the dimensions and levels required by the Drawings. <br />F. Safeguard all points, stakes, grademarks, monuments, and benchmarks made or <br />established on the Work, and reestablish same if disturbed, at no additional cost <br />to the OWNER. Rectify all Work improperly installed because of not <br />maintaining, not protecting or removing without authorization, such established <br />points, stakes, marks, and monuments. <br />G. The OWNER or its survey contractor may visit the site from time -to -time to <br />review, confirm, or check the CONTRACTOR's construction staking. Cooperate <br />fully with these activities. <br />H. When requested by the ENGINEER's CONSULTANT, provide such facilities and <br />assistance as necessary for the ENGINEER Is CONSULTANT to check line and <br />grade points placed by the CONTRACTOR. Do no excavation or embankment <br />work until all cross -sectioning necessary for determining pay quantities has been <br />completed and checked by the ENGINEER's CONSULTANT. <br />The cost of performing engineering and layout work described above shall be <br />included in the Contract unit prices for the various items of work to which it is <br />incidental. No separate payment will be made for surveying or engineering. <br />Last Revised 12/2007 01050-1 Wabasso Beach Pk Restoration <br />FAPublic Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div 1\01050 - <br />Field Engineering.doc <br />