My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01220 <br /> PROGRESS MEETINGS <br /> 1 . 1 SCOPE <br /> A . Date and Time : <br /> 1 . Regular Meetings : As mutually agreed upon by ENGINEER and <br /> CONTRACTOR . <br /> 2 , Other Meetings : On call . <br /> B . Place : ENGINEER's office , at Project site , or other mutually agreed upon location . <br /> C . ENGINEER shall prepare agenda , preside at meetings , and prepare and distribute a <br /> transcript of proceedings to all parties . <br /> D . CONTRACTOR shall provide data required and be prepared to discuss all items on <br /> agenda . <br /> E . Representatives present for each party shall be authorized to act on their behalf. <br /> 1 . 2 MINIMUM ATTENDANCE <br /> A . CONTRACTOR : <br /> 1 . When needed for the discussion of a particular agenda item , require <br /> representatives of subcontractors or suppliers to attend the meeting . <br /> B . ENGINEER' s CONSULTANT . <br /> C . OWNER' s representative or ENGINEER . <br /> 1 . 3 AGENDA <br /> A . Agenda will include , but will not necessarily be limited to , the following : <br /> 1 . Transcript of previous meeting . <br /> 2 . Progress since last meeting . <br /> 3 . Vendor meetings and equipment installation . <br /> 4 . Utility concerns . <br /> 5 . Planned progress for next period . <br /> 6 . Problems , conflicts and observations . <br /> 7 . Change Orders/Pay Requests , <br /> 8 . Status of Shop Drawings . <br /> 9 . Quality standards and control . <br /> 10 . Schedules , including off-site fabrication and delivery schedules . Corrective <br /> measures , if required . <br /> 11 . Coordination between parties . <br /> 12 . Safety concerns . <br /> 13 . Other business . <br /> + + END OF SECTION + + <br /> Last Revised 12/2007 01220- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01220 - Progress Meetings.doc <br /> irr <br />