Laserfiche WebLink
requirements of the Contract Documents is not.relieved by the ENGINEER's or <br />ENGINEER's CONSULTANT's review of submittals, unless the ENGINEER or <br />ENGINEER's CONSULTANT gives written acceptance of specific deviations. <br />E. Begin no work that requires submittals until return of submittals with the <br />ENGINEER's or ENGINEER's CONSULTANT's stamp and initials or signature <br />indicating the submittal has been reviewed. <br />1.7 SUBMITTAL REQUIREMENTS AND ENGINEER'S REVIEW FOR SHOP <br />DRAWINGS, DESIGN DRAWINGS, PRODUCT DATA AND SAMPLES <br />A. Submit to: Indian River County <br />Clifford Suthard, P.E. <br />4378 43rd Avenue, Unit 102 <br />Vero Beach, FL 32967 <br />Be A letter of transmittal shall accompany each submittal. If data for more than one <br />Section of the Specifications is submitted, a separate transmittal letter shall <br />accompany the data submitted for each Section. <br />C. At the beginning of each letter of transmittal, provide a reference heading <br />indicating the following: <br />1. OWNER'S Name <br />2. Project Name <br />3, Project Number <br />4. Transmittal Number <br />5. Section Number <br />D. All submittals shall have a title block with complete identifying information <br />satisfactory to the ENGINEER. The following is a sample Submittal Form that <br />the CONTRACTOR may use: <br />[The remainder of this page has been left blank intentionally] <br />Last Revised 12/2007 <br />01340-3 Wabasso Beach Pk Restoration <br />FAPublic Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div 1\01340 - Submittal of Shop Drawings, Product Data, and Samples.doc <br />