Laserfiche WebLink
r <br /> Be Design drawings shall be prepared by a qualified , appropriately licensed <br /> professional and shall be identified by reference to specification section number, <br /> sheet , and detail numbers on the Contract Drawings . <br /> 1 . 5 SAMPLES <br /> A . Samples are physical examples to illustrate materials , equipment , or <br /> workmanship and to establish standards by which work is to be evaluated . <br /> Samples are further defined in Section 01330 . <br /> i• 1 . 6 CONTRACTOR' S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br /> DRAWINGS , DESIGN DRAWINGS , PRODUCT DATA , AND SAMPLES <br /> A . The CONTRACTOR' s responsibilities for submittal of shop drawings , design <br /> drawings , product data , and samples are set forth in paragraph 6 . 17 of the <br /> General Conditions and as further explained herein . <br /> Be Prior to submission , thoroughly check shop drawings , design drawings , product <br /> data , and samples for completeness and for compliance with the Contract <br /> Documents , verify all dimensions and field conditions , and coordinate the shop <br /> drawings with the requirements for other related work . Also review each shop <br /> drawing before submitting it to the ENGINEER to determine that it is acceptable <br /> in terms of the means , methods , techniques , sequences and operations of <br /> construction , safety precautions and programs incidental thereto , all of which are <br /> the CONTRACTOR' s responsibility . <br /> 1 . It is CONTRACTOR'S responsibility to review submittals made by his <br /> suppliers and Subcontractors before transmitting them to ENGINEER to <br /> assure proper coordination of the Work and to determine that each <br /> submittal is in accordance with its desires and that there is sufficient <br /> information about materials and equipment for ENGINEER or <br /> ENGINEER' S CONSULTANT to determine compliance with the Contract <br /> Documents . <br /> 2 . Incomplete or inadequate submittals will be returned for revision without <br /> review . <br /> C . The CONTRACTOR's responsibility for errors and omissions in submittals is not <br /> relieved by the ENGINEER' s or ENGINEER's CONSULTANT' s review of <br /> submittals . The CONTRACTOR shall approve the shop drawings based on his <br /> in -the-field measurements , prior to submittal to the ENGINEER for review . <br /> D . Notify the ENGINEER , in writing at the time of submission , of deviations in <br /> submittals from the requirements of the Contract Documents , The <br /> CONTRACTOR' s responsibility for deviations in submittals from the <br /> Last Revised 12/2007 01340-2 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \0 1340 - Submittal of Shop Drawings, Product Data , and Samples .doc <br /> it <br />