My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Be Design drawings shall be prepared by a qualified , appropriately licensed <br /> professional and shall be identified by reference to specification section number, <br /> sheet , and detail numbers on the Contract Drawings . <br /> 1 . 5 SAMPLES <br /> A . Samples are physical examples to illustrate materials , equipment , or <br /> workmanship and to establish standards by which work is to be evaluated . <br /> Samples are further defined in Section 01330 . <br /> i• 1 . 6 CONTRACTOR' S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br /> DRAWINGS , DESIGN DRAWINGS , PRODUCT DATA , AND SAMPLES <br /> A . The CONTRACTOR' s responsibilities for submittal of shop drawings , design <br /> drawings , product data , and samples are set forth in paragraph 6 . 17 of the <br /> General Conditions and as further explained herein . <br /> Be Prior to submission , thoroughly check shop drawings , design drawings , product <br /> data , and samples for completeness and for compliance with the Contract <br /> Documents , verify all dimensions and field conditions , and coordinate the shop <br /> drawings with the requirements for other related work . Also review each shop <br /> drawing before submitting it to the ENGINEER to determine that it is acceptable <br /> in terms of the means , methods , techniques , sequences and operations of <br /> construction , safety precautions and programs incidental thereto , all of which are <br /> the CONTRACTOR' s responsibility . <br /> 1 . It is CONTRACTOR'S responsibility to review submittals made by his <br /> suppliers and Subcontractors before transmitting them to ENGINEER to <br /> assure proper coordination of the Work and to determine that each <br /> submittal is in accordance with its desires and that there is sufficient <br /> information about materials and equipment for ENGINEER or <br /> ENGINEER' S CONSULTANT to determine compliance with the Contract <br /> Documents . <br /> 2 . Incomplete or inadequate submittals will be returned for revision without <br /> review . <br /> C . The CONTRACTOR's responsibility for errors and omissions in submittals is not <br /> relieved by the ENGINEER' s or ENGINEER's CONSULTANT' s review of <br /> submittals . The CONTRACTOR shall approve the shop drawings based on his <br /> in -the-field measurements , prior to submittal to the ENGINEER for review . <br /> D . Notify the ENGINEER , in writing at the time of submission , of deviations in <br /> submittals from the requirements of the Contract Documents , The <br /> CONTRACTOR' s responsibility for deviations in submittals from the <br /> Last Revised 12/2007 01340-2 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \0 1340 - Submittal of Shop Drawings, Product Data , and Samples .doc <br /> it <br />
The URL can be used to link to this page
Your browser does not support the video tag.