My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t- <br /> L <br /> SECTION 01610 <br /> TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> 1 . 1 GENERAL <br /> A . Make all arrangements for transportation , delivery and handling of equipment and <br /> materials required for prosecution and completion of the Work . <br /> Be Shipments of materials to CONTRACTOR or Subcontractors shall be delivered to <br /> the site only during regular working hours . Shipments shall be addressed and <br /> consigned to the proper party , giving name of Project , street number and city . Do <br /> not deliver shipments to OWNER . <br /> k <br /> C . If necessary to move stored materials and equipment during construction , move <br /> or cause to be moved materials and equipment without any additional compensa- <br /> tion . <br /> 1 . 2 DELIVERY <br /> 6 A . Arrange deliveries of products in accord with construction schedules and in ample <br /> time to facilitate inspection prior to installation . <br /> Be Coordinate deliveries to avoid conflict with Work and conditions at site and to <br /> accommodate the following : <br /> 1 . Work of other contractors , or OWNER . <br /> 2 . Limitations of storage space . <br /> 3 . Availability of equipment and personnel for handling products . <br /> 4 . OWNER'S use of premises . <br /> C . Do not have products delivered to project site until related Shop Drawings have <br /> been approved by the ENGINEER or the ENGINEER' s CONSULTANT . <br /> D . Do not have products delivered to site until required secure , storage facilities have <br /> been provided . <br /> E . Have products delivered to site in manufacturer's original , unopened , labeled <br /> containers . Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work . <br /> F . Clearly mark partial deliveries of component parts of equipment to identify the <br /> equipment , to permit easy accumulation of parts , and to facilitate assembly . <br /> Last Revised 12/2007 01610- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01610 - Transportation & Handling .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.