Laserfiche WebLink
t- <br /> L <br /> SECTION 01610 <br /> TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> 1 . 1 GENERAL <br /> A . Make all arrangements for transportation , delivery and handling of equipment and <br /> materials required for prosecution and completion of the Work . <br /> Be Shipments of materials to CONTRACTOR or Subcontractors shall be delivered to <br /> the site only during regular working hours . Shipments shall be addressed and <br /> consigned to the proper party , giving name of Project , street number and city . Do <br /> not deliver shipments to OWNER . <br /> k <br /> C . If necessary to move stored materials and equipment during construction , move <br /> or cause to be moved materials and equipment without any additional compensa- <br /> tion . <br /> 1 . 2 DELIVERY <br /> 6 A . Arrange deliveries of products in accord with construction schedules and in ample <br /> time to facilitate inspection prior to installation . <br /> Be Coordinate deliveries to avoid conflict with Work and conditions at site and to <br /> accommodate the following : <br /> 1 . Work of other contractors , or OWNER . <br /> 2 . Limitations of storage space . <br /> 3 . Availability of equipment and personnel for handling products . <br /> 4 . OWNER'S use of premises . <br /> C . Do not have products delivered to project site until related Shop Drawings have <br /> been approved by the ENGINEER or the ENGINEER' s CONSULTANT . <br /> D . Do not have products delivered to site until required secure , storage facilities have <br /> been provided . <br /> E . Have products delivered to site in manufacturer's original , unopened , labeled <br /> containers . Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work . <br /> F . Clearly mark partial deliveries of component parts of equipment to identify the <br /> equipment , to permit easy accumulation of parts , and to facilitate assembly . <br /> Last Revised 12/2007 01610- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01610 - Transportation & Handling .doc <br />