Laserfiche WebLink
G . Immediately on delivery , inspect shipment to assure : <br /> 1 . Product complies with requirements of Contract Documents and reviewed <br /> submittals . <br /> 2 . Quantities are correct . <br /> 3 . Containers and packages are intact ; labels are legible . <br /> 4 . Products are properly protected and undamaged . <br /> 5 . OWNER is advised OWNER provided items are delivered . <br /> 1 . 3 PRODUCT HANDLING <br /> A . Provide equipment and personnel necessary to handle products , by methods to <br /> prevent soiling or damage to products or packaging . <br /> B . Provide additional protection during handling as necessary to prevent scraping , <br /> marring or otherwise damaging products or surrounding surfaces . <br /> C . Handle products by methods to prevent bending or overstressing . <br /> D . Lift heavy components only at designated lifting points . <br /> E . Always handle materials and equipment in a safe manner and as recommended <br /> by manufacturer or supplier so that no damage will occur to them . Do not drop , <br /> roll , or skid products off delivery vehicles . Hand carry or use suitable materials <br /> handling equipment . <br /> + + END OF SECTION + + <br /> Last Revised 12/2007 01610-2 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01610 - Transportation & Handling .doc <br />