Laserfiche WebLink
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> A . Furnish all labor, equipment , appliances , and materials required or necessary to <br /> clean up and restore the site after the construction is completed . <br /> 1 . 2 REQUIREMENTS <br /> A . During the progress of the project , keep the work and the adjacent areas <br /> affected thereby in a neat and orderly condition . Remove all rubbish , surplus <br /> materials , and unused construction equipment . Repair all damage so that the <br /> public and property owners will be inconvenienced as little as possible . <br /> B . Provide onsite containers for the collection of waste materials , debris , and <br /> rubbish and empty such containers in a legal manner when they become full . <br /> C . Where material or debris has been deposited in watercourses , ditches , gutters , <br /> drains , or catch - basins as a result of the CONTRACTOR's operations , such <br /> material or debris shall be entirely removed and satisfactorily disposed of during <br /> the progress of the work , and the ditches , channels , drains , etc . , shall be kept <br /> clean and open at all times . <br /> D . Before the completion of the project, unless otherwise especially directed or <br /> permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery , or other construction <br /> equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , walks , and all parts of the premises , and all property <br /> affected by construction operations , in a neat and satisfactory condition . <br /> E . Restore or replace any public or private property damaged by construction work , <br /> equipment , or employees , to a condition at least equal to that existing <br /> immediately prior to the beginning of the operations . Restore all private property <br /> and all highway , roadside , and landscaping work within any right-of-way , <br /> easement , platted or prescriptive areas . Acceptable materials , equipment , and <br /> methods shall be used for such restoration . <br /> F . Thoroughly clean all materials and equipment and on completion of the Work , <br /> deliver the facilities undamaged and in fresh and new-appearing condition . <br /> G . It is the intent of the Specifications to place the responsibility on the <br /> Last Revised 12/2007 01710- 1 Wabasso Beach Pk Restoration <br /> F:\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \0 1710 - Site Cleanup & Restoration .doc <br />