My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> A . Furnish all labor, equipment , appliances , and materials required or necessary to <br /> clean up and restore the site after the construction is completed . <br /> 1 . 2 REQUIREMENTS <br /> A . During the progress of the project , keep the work and the adjacent areas <br /> affected thereby in a neat and orderly condition . Remove all rubbish , surplus <br /> materials , and unused construction equipment . Repair all damage so that the <br /> public and property owners will be inconvenienced as little as possible . <br /> B . Provide onsite containers for the collection of waste materials , debris , and <br /> rubbish and empty such containers in a legal manner when they become full . <br /> C . Where material or debris has been deposited in watercourses , ditches , gutters , <br /> drains , or catch - basins as a result of the CONTRACTOR's operations , such <br /> material or debris shall be entirely removed and satisfactorily disposed of during <br /> the progress of the work , and the ditches , channels , drains , etc . , shall be kept <br /> clean and open at all times . <br /> D . Before the completion of the project, unless otherwise especially directed or <br /> permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery , or other construction <br /> equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , walks , and all parts of the premises , and all property <br /> affected by construction operations , in a neat and satisfactory condition . <br /> E . Restore or replace any public or private property damaged by construction work , <br /> equipment , or employees , to a condition at least equal to that existing <br /> immediately prior to the beginning of the operations . Restore all private property <br /> and all highway , roadside , and landscaping work within any right-of-way , <br /> easement , platted or prescriptive areas . Acceptable materials , equipment , and <br /> methods shall be used for such restoration . <br /> F . Thoroughly clean all materials and equipment and on completion of the Work , <br /> deliver the facilities undamaged and in fresh and new-appearing condition . <br /> G . It is the intent of the Specifications to place the responsibility on the <br /> Last Revised 12/2007 01710- 1 Wabasso Beach Pk Restoration <br /> F:\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \0 1710 - Site Cleanup & Restoration .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.