SECTION 01710 <br />SITE CLEANUP AND RESTORATION <br />1.1 SCOPE <br />A. Furnish all labor, equipment, appliances, and materials required or necessary to <br />clean up and restore the site after the construction is completed. <br />1.2 REQUIREMENTS <br />A. During the progress of the project, keep the work and the adjacent areas <br />affected thereby in a neat and orderly condition. Remove all rubbish, surplus <br />materials, and unused construction equipment. Repair all damage so that the <br />public and property owners will be inconvenienced as little as possible. <br />B. Provide onsite containers for the collection of waste materials, debris, and <br />rubbish and empty such containers in a legal manner when they become full. <br />C. Where material or debris has been deposited in watercourses, ditches, gutters, <br />drains, or catch -basins as a result of the CONTRACTOR's operations, such <br />material or debris shall be entirely removed and satisfactorily disposed of during <br />the progress of the work, and the ditches, channels, drains, etc., shall be kept <br />clean and open at all times. <br />D. Before the completion of the project, unless otherwise especially directed or <br />permitted in writing: <br />1. Tear down and remove all temporary buildings and structures; <br />2. Remove all temporary works, tools, and machinery, or other construction <br />equipment furnished; <br />3. Remove all rubbish from any grounds occupied; and <br />4. Leave the roads, walks, and all parts of the premises, and all property <br />affected by construction operations, in a neat and satisfactory condition. <br />E. Restore or replace any public or private property damaged by construction work, <br />equipment, or employees, to a condition at least equal to that existing <br />immediately prior to the beginning of the operations. Restore all private property <br />and all highway, roadside, and landscaping work within any right-of-way, <br />easement, platted or prescriptive areas. Acceptable materials, equipment, and <br />methods shall be used for such restoration. <br />F. Thoroughly clean all materials and equipment and on completion of the Work, <br />deliver the facilities undamaged and in fresh and new -appearing condition. <br />G. It is the intent of the Specifications to place the responsibility on the <br />Last Revised 12/2007 01710-1 Wabasso Beach Pk Restoration <br />FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div 1 \0 1710 - Site Cleanup & Restoration.doc <br />