My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01720 <br /> RECORD DOCUMENTS <br /> 1 . 1 GENERAL <br /> A . Maintain and provide the ENGINEER with record documents as specified below , <br /> except where otherwise specified or modified in the Supplementary Conditions or <br /> elsewhere herein . <br /> B . Maintenance of Documents : <br /> 1 . Maintain complete sets of record documents in the field office in clean , dry , <br /> legible condition . " Record Documents" include but are not limited to : Drawings <br /> ( including Contract Drawings , Record Drawings , and electronic files of Record <br /> Drawings ) , Specifications , Addenda , approved Shop Drawings , Design <br /> Drawings , samples , photographs , Change Orders , other modifications of <br /> Contract Documents , test records , survey data , Field Orders , and all other <br /> documents pertinent to CONTRACTOR'S Work . <br /> 2 . Provide files and racks for proper storage and easy access . <br /> 3 . Make documents available at all times for inspection by ENGINEER , <br /> ENGINEER' s CONSULTANT , and OWNER . <br /> 4 . Do not use record documents for any other purpose and do not remove them <br /> from the field office . <br /> D . Recording : <br /> 1 . Label each document " PROJECT RECORD " in 2 - inch high printed letters . <br /> 2 . Keep record documents current . <br /> 3 . Do not permanently conceal any Work until required information has been <br /> recorded . <br /> 1 . 2 RECORD DRAWINGS <br /> A . During the entire construction operation , maintain records of all deviations from the <br /> Drawings and Specifications and prepare therefrom , " Record Drawings" showing <br /> correctly and accurately , all changes and deviations from the Work made during <br /> construction , to reflect the Work as it was actually constructed . <br /> B . Mark whichever drawing is most capable of showing the constructed condition fully <br /> and accurately ; however , where shop drawings are used for mark-up , record a <br /> cross- reference at the corresponding location on the contract drawings . Mark- up <br /> new information that is recognized to be of importance to the OWNER , but was not <br /> shown on either the contract drawings or shop drawings . Give particular attention <br /> Last Revised 12/2007 01720- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div <br /> 1 \01720 - Record <br /> Documents.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.